Download presentation
Presentation is loading. Please wait.
Published byDerek Watkins Modified over 9 years ago
1
IT Planning and Managment Collage of Information Technology University of Palestine, Gaza Prepared by: Mahmoud Rafeek Alfarra Lecture 7: Information System for a Volunteer Center: System Design for Not-For-Profit Organizations with Limited Resources Part 3: The Current System and discuss the students’ system requests
2
يقول الله تعالى لنبيه صلى الله عليه وسلم و لاتباعه من بعده : ( وَاصْبِرْ نَفْسَكَ مَعَ الَّذِينَ يَدْعُونَ رَبَّهُم بِالْغَدَاةِ وَالْعَشِيِّ يُرِيدُونَ وَجْهَهُ وَلَا تَعْدُ عَيْنَاكَ عَنْهُمْ تُرِيدُ زِينَةَ الْحَيَاةِ الدُّنْيَا وَلَا تُطِعْ مَنْ أَغْفَلْنَا قَلْبَهُ عَن ذِكْرِنَا وَاتَّبَعَ هَوَاهُ وَكَانَ أَمْرُهُ فُرُطاً ) الكهف 28 إنها آية لخص الله تعالى فيها منهج كل مسلم في اختيار جُلَسَاءَه و أصدقاءَه
3
Outlines The Current System diagrams for the current system Analysis of the Current System Discuss the students ’ system requests
4
The Current System The project team reviewed the current information systems at VCR. The VCR maintained and processed four general types of information: 1.payroll, 2.expenses, 3.donors, and 4.volunteer information.
5
The Current System Terminology was initially unfamiliar Station is a place where volunteers work by devoting their time and effort. A job refers to a specific activity that a volunteer performs at a specific station. Placement is the process of matching volunteers, depending on their skills and interests, with specific jobs at stations..
6
Two current system Currently, VCR uses an electronic system for maintaining senior volunteers, 55 and Older. Their activities under the retired and senior Volunteer Program.
7
Two current system Activities of all other volunteers (younger than 55 years) are maintained using paper processes.
8
Documented Current business processes Jeff and his team documented the current business processes using UML documentation such as the use- case diagram. Jeff McCoy, leader of the project team, created use-case diagram to illustrate the different activities performed by the current electronic system.
9
Diagrams for the current system the current electronic system 1.Use-case diagram illustrates the different activities performed by the current electronic system. current manual/paper processes 2.Use-case diagram for the current manual/paper processes
10
Current Electronic System The actors in the above use-case diagram include the following: 55-or-older volunteers, VCR-employees, Station-coordinators. The current electronic system maintains information only on volunteers who are 55 or older. More details in page 8 …
11
Assignments: submission policy Last Job Station Volunteers 55 and older Station coordinates Specific event Retried from … Request Vol. Report hours
12
The current manual/paper processes This includes all processes not integrated with the current electronic system. Some of the processes indicated in this use-case diagram do not necessarily involve “paper.” However, they use manual processes such as using the typewriter or maintaining documents and spreadsheets that are not integrated with the electronic system.
13
The current manual/paper processes The actors in the above use-case diagram include the following: VCR-employee and The donor.
14
The current manual/paper processes
15
Analysis of the Current System Based on the analysis of the current system, these are the problems and opportunities for improvement: 1.Problem: 1.Problem: The Volunteer Center is using a hybrid paper and electronic system. Opportunity: Combine into one unified electronic system. Remaining 8 problems are distributed to students …
16
Discuss the students’ system requests Each student has 5 to 7 min. to present his/her system request: Give us a brief about the enterprise The current system Problems Solutions and more …
17
Next Lecture isa The Goaled System
18
Thank You … Question ?!
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.