Download presentation
Presentation is loading. Please wait.
Published byMarylou Patterson Modified over 9 years ago
1
THEATRE 2000
2
2008
3
THE ROMAN THEATRE AND ITS MUSEUM: A AVANT-GARDE ARCHAEOLOGICAL AND ARCHITECTURAL JEWEL ITS REMAINS WERE HIDDEN FOR CENTURIES. ITS REMAINS WERE HIDDEN FOR CENTURIES. INVESTIGATION HAS PERMITED US TO KNOW AND UNDERSTAND THE EXCEPTIONAL ARCHITECTURE, DECORATION AND SIGNIFICANCE OF THE ROMAN MONUMENT. INVESTIGATION HAS PERMITED US TO KNOW AND UNDERSTAND THE EXCEPTIONAL ARCHITECTURE, DECORATION AND SIGNIFICANCE OF THE ROMAN MONUMENT. THE ARCHAEOLOGICAL WORKS HAVE REVEAL CRUCIAL INFORMATION TO INTERPRET 20 CENTURIES OF THE CITY´S HISTORY. THE ARCHAEOLOGICAL WORKS HAVE REVEAL CRUCIAL INFORMATION TO INTERPRET 20 CENTURIES OF THE CITY´S HISTORY.
10
THE ROMAN THEATRE AND ITS MUSEUM: A AVANT-GARDE ARCHAEOLOGICAL AND ARCHITECTURAL JEWEL RAFAEL MONEO IS THE WORLDWIDE FAMOUS ARCHITECT DRAFTER OF THE TOTAL PROYECT. RAFAEL MONEO IS THE WORLDWIDE FAMOUS ARCHITECT DRAFTER OF THE TOTAL PROYECT. INVESTMENT: 45 MILLION EUROS. INVESTMENT: 45 MILLION EUROS. OPENING: JULY 2008. OPENING: JULY 2008. IN SIX MONTHS 80.000 VISITORS. IN SIX MONTHS 80.000 VISITORS.
16
81.180 VISITORS IN SIX MONTHS
18
CARTAGENA´S OLD DOWNTOWN,TODAY 277.000 VISITORS IN 2008. 277.000 VISITORS IN 2008. 55 CRUISE LINERS AND 70.000 CRUISERS EXPECTED FOR 2009. 55 CRUISE LINERS AND 70.000 CRUISERS EXPECTED FOR 2009. 4.324 OF HOMES. 4.324 OF HOMES. 24.381 Nº RESIDENTS. 24.381 Nº RESIDENTS. 1.700 Nº OF SHOPS. 1.700 Nº OF SHOPS.
27
CARTAGENA, FUTURE PROYECTS CONGRESS HALL. CONGRESS HALL. NATIONAL MUSEUM OF SUBACUATIC ARCHAEOLOGY. NATIONAL MUSEUM OF SUBACUATIC ARCHAEOLOGY. ROMAN AMPHITHEATRE AND CONTEMPORARY ART MUSEUM. ROMAN AMPHITHEATRE AND CONTEMPORARY ART MUSEUM.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.