ISGC’2007, Taipei, 28-3-2007 Grid Computing Program at Peking University in EUChinaGRID Project
2
S. Qian PKU program in EUChinaGRID project 2 ISGC’2007, Taipei, 28-3-2007 Outline EUChinaGRID project and PKU group Grid infrastructure at PKU (School of Physics) WP4 (for Grid application) activities at PKU – Biology subgroup: Protein structure analysis – Physics subgroup: CMS Monte-Carlo simulation and physics analysis Main problems and solutions –Networking –Software installation at Grid sites Summary
3
S. Qian PKU program in EUChinaGRID project 3 ISGC’2007, Taipei, 28-3-2007 EUChinaGRID Project 欧中网格项目 (More details will be presented by Dr. Giuseppe ANDRONICO tomorrow)
4
S. Qian PKU program in EUChinaGRID project 4 ISGC’2007, Taipei, 28-3-2007 Project Banner Interconnection and Interoperability of Grids between Europe and China
5
S. Qian PKU program in EUChinaGRID project 5 ISGC’2007, Taipei, 28-3-2007 Timescale & Budget The official start of the project: 1st January 2006. Duration: 24 Months EU Contribution: 1,299,998 €. A total 495 Person Months (325 Funded) of effort
6
S. Qian PKU program in EUChinaGRID project 6 ISGC’2007, Taipei, 28-3-2007 Partners 1 Istituto Nazionale di Fisica Nucleare (IT) (coordinator) 2European Organisation for Nuclear Research (CERN) (CH) 3Università di Roma Tre, Dipartimento di Biologia – Rome (IT) 4Consortium GARR (IT) 5Greek Research & Technology Network (GR) 6Jagiellonian University, Medical College – Cracow (PL) 7School of Computer Science and Engineering – Beihang University – Beijing (CN) 8Computer Network Information Center, Chinese Academy of Sciences (CAS) – Beijing (CN) 9Institute of High Energy Physics, CAS – Beijing (CN) 10Peking University – Beijing (CN)
7
S. Qian PKU program in EUChinaGRID project 7 ISGC’2007, Taipei, 28-3-2007 Third Parties 1Academia Sinica Grid Computing Centre (ASGC) – Taipei 2Università di Roma Tre, Dipartimento di Fisica – Rome (IT)
8
S. Qian PKU program in EUChinaGRID project 8 ISGC’2007, Taipei, 28-3-2007 Targets of the Project To foster the creation of a intercontinental eScience community –Training people –Supporting existing and new applications To support interoperable infrastructure for grid operations between Europe (EGEE) and China (CNGRID)
9
S. Qian PKU program in EUChinaGRID project 9 ISGC’2007, Taipei, 28-3-2007 WPs (Working Packages)
10
S. Qian PKU program in EUChinaGRID project 10 ISGC’2007, Taipei, 28-3-2007 Work Breakdown Structures WPName 1Project Administrative and technical management (项目行政和技术管理) 2Network planning and interoperability study (网络规划与互操作研究 ) 3Pilot infrastructure operational support (示范基础设施的运作支持 ) PKU 4 Applications (应用) PKU 5 Dissemination (宣传推广) PKU
11
S. Qian PKU program in EUChinaGRID project 11 ISGC’2007, Taipei, 28-3-2007 Collaborative tools
12
S. Qian PKU program in EUChinaGRID project 12 ISGC’2007, Taipei, 28-3-2007 Project Web Sites www.euchinagrid.eu and www.euchinagrid.cn www.euchinagrid.cn (English) (Chinese 中文 )
13
S. Qian PKU program in EUChinaGRID project 13 ISGC’2007, Taipei, 28-3-2007 Infrastructure 基础设施
14
S. Qian PKU program in EUChinaGRID project 14 ISGC’2007, Taipei, 28-3-2007 RB (Resource Broker) + BDII (Berkely Database Information Index) at CNAF (Italy) VOMS at CNAF https://voms2.cnaf.infn.it:8443/voms/euchina/ GridIce ( Grid sites monitoring ) at CNAF Sites linked: –Roma 3 (Italy) –CNAF (Italy) –Catania (Italy) –Athens (Greece) –3 sites in Beijing (CNIC, IHEP and PKU) What we have already done
15
S. Qian PKU program in EUChinaGRID project 15 ISGC’2007, Taipei, 28-3-2007 Sites Map
16
S. Qian PKU program in EUChinaGRID project 16 ISGC’2007, Taipei, 28-3-2007 Sites Monitoring BEIJING - PKU
17
S. Qian PKU program in EUChinaGRID project 17 ISGC’2007, Taipei, 28-3-2007 1)April 3-7, 2006 in Beijing, China (done) 2)April 18-21, 2006 in Rome, Italy (done) 3)June 12-16, 2006 at IHEP + Project’s 1 st Workshop in Beijing, China (done) 4)September 15-22, 2006 in Rome, Italy + Project’s 1 st Conference (done) 5)November 25-26, 2006 at Peking University (done). All Chinese tutors in first time. 6)April 16-20, 2007 at CNIC, Beijing, China Training Program
18
S. Qian PKU program in EUChinaGRID project 18 ISGC’2007, Taipei, 28-3-2007 Peking University in EUChinaGRID Project
19
S. Qian PKU program in EUChinaGRID project 19 ISGC’2007, Taipei, 28-3-2007 Subgroups & Personnel Biological Research – Protein structure study with NMR (led by Prof. B. XIA ,夏滨 ) –C. JIN, Y. FENG, W. GONG, X. GUO, T. WANG. –To participate in WP4 (4.3) High Energy Physics Research – CMS experiment on LHC at CERN (led by Prof. S. QIAN ,钱思进 ) –Z. YANG, L. ZHAO, D. MU, S. ZHU, K. KANG –To participate in WP4 (4.1) and WP3 Also, both groups are working in WP5
20
S. Qian PKU program in EUChinaGRID project 20 ISGC’2007, Taipei, 28-3-2007 Biology Group
21
S. Qian PKU program in EUChinaGRID project 21 ISGC’2007, Taipei, 28-3-2007 Beijing N uclear M agnetic R esonance Center Sponsored by Ministry of Science and Technology, Ministry of Education, Chinese Academy of Science, Chinese Academy of Military Medical Sciences, Managed by Peking University. National NMR facility established on Nov. 4th, 2002 For research and training in bio-molecular NMR studies We need to use computer for processing and analyzing NMR data, for solution structure calculation, and for molecular dynamic simulation.
22
S. Qian PKU program in EUChinaGRID project 22 ISGC’2007, Taipei, 28-3-2007 Key method for obtaining high resolution structure -----in addition to X-ray Structure Physiological temperature and condition -----closer to native functional state Time consuming for structure calculation -----multiple structures and multiple rounds NMR Spectroscopy
23
S. Qian PKU program in EUChinaGRID project 23 ISGC’2007, Taipei, 28-3-2007 NMR Structure Determination
24
S. Qian PKU program in EUChinaGRID project 24 ISGC’2007, Taipei, 28-3-2007 From Constraints to Structure Restrained molecular dynamics and simulated annealing
25
S. Qian PKU program in EUChinaGRID project 25 ISGC’2007, Taipei, 28-3-2007 V = E empirical + E effective with: E effective = E NOE + E torsion and E empirical = E bond + E angle + E dihedral + E vdw + E electr Empirical energy contains all information about the primary structure of the protein and also data about topology and bonds in proteins in general. Empirical energy are from experimental data. Force Field
26
S. Qian PKU program in EUChinaGRID project 26 ISGC’2007, Taipei, 28-3-2007 Energy Minimization
27
S. Qian PKU program in EUChinaGRID project 27 ISGC’2007, Taipei, 28-3-2007 Structure Calculation and Refinement Normally, 200 structures/round, > 30 rounds.
28
S. Qian PKU program in EUChinaGRID project 28 ISGC’2007, Taipei, 28-3-2007 Recent Structures 1Z6H 2AI6 1Z7P 2FHM 2HF6 2B9K
29
S. Qian PKU program in EUChinaGRID project 29 ISGC’2007, Taipei, 28-3-2007 Analysis Software Protein structure analysis software: Amber. Licenses are needed to be granted on all computers involved. University Rome III has procured the license and is testing it, hopefully it can be available for use in near future.
30
S. Qian PKU program in EUChinaGRID project 30 ISGC’2007, Taipei, 28-3-2007 PKU-Biology Computing Need By using the Intel 2.4 GHz Xeon CPU Each structure needs 4 hours Each time to compute 200 structures Each protein needs to be computed for 10 times Totally 10 proteins to be analyzed ~ 80,000 hours (> 9 years) CPU time > 1TB storage space
31
S. Qian PKU program in EUChinaGRID project 31 ISGC’2007, Taipei, 28-3-2007 Physics Group
32
S. Qian PKU program in EUChinaGRID project 32 ISGC’2007, Taipei, 28-3-2007 Physics Data Analysis for CMS Experiment CMS group in the Physics School of Peking University has started to use Grid tools to analyze physics data of CMS experiments on LHC at CERN since 9/2005 Huge amount of Monte-Carlo data (from now on) and real data (collected from the end of 2007) shall await for us to analyze 27 km circumference LHC completion date: 2007.11
33
S. Qian PKU program in EUChinaGRID project 33 ISGC’2007, Taipei, 28-3-2007 L HC C omputing G rid Model les.robertson@cern.ch physics group regional group Tier2 Lab a Uni a Lab c Uni n Lab m Lab b Uni b Uni y Uni x Tier3 physics department Desktop Germany Tier 1 USA UK France Italy ………. CERN Tier 1 ………. The LHC Computing Centre CERN Tier 0
34
S. Qian PKU program in EUChinaGRID project 34 ISGC’2007, Taipei, 28-3-2007 LCG Architecture at PKU Installed at PKU (UI) (SE) (CE) (WN) (SE) Installed at PKU (UI) (CE) @IHEP
35
S. Qian PKU program in EUChinaGRID project 35 ISGC’2007, Taipei, 28-3-2007 Working History Single J/ generation (without background) and reconstruction by using local computers in 6/2005 Single J/ study with min-biased background in 7/2005 Analyzed 500 B 0s J/ + events from a DST (Data Summary Tapes) at CERN in 8/2005 Analyzed nearly 200,000 B 0s events from a DST stored in Italy by using Computing Grid tools from 9/2005 and going on Preparing the massive (> 2 millions J/ events) Monte-Carlo simulation
36
S. Qian PKU program in EUChinaGRID project 36 ISGC’2007, Taipei, 28-3-2007 Procedure of Grid Application The latest procedure via the IHEP LCG Tier-2 facility: PKU’s UI gets the results from submit the jobs IHEP’s RB run the jobs, send the jobs to CE return the results to IHEP’s RB give the jobs to WN UI (User Interface)@PKU, China RB (Resource Broker)@IHEP, China CE (Computing Element)@CNAF, Italy WN (Work Nodes)@CNAF, Italy
37
S. Qian PKU program in EUChinaGRID project 37 ISGC’2007, Taipei, 28-3-2007 Sample Result J/psi reconstruction efficiency as a function of PT (both muons’ |eta|<=2.4) J/ reconstruction efficiency in CMS experiment
38
S. Qian PKU program in EUChinaGRID project 38 ISGC’2007, Taipei, 28-3-2007 First CMS Analysis Note by Peking Univ. Group
39
S. Qian PKU program in EUChinaGRID project 39 ISGC’2007, Taipei, 28-3-2007 PKU-Physics Computing Need In 2007, we would wish to generate > 2 million events each for prompt J/Psi and Upsilon + 40% of background events For each 1 million events, it needs about 24,000 hours (or 1000 days) of CPU time (for one P4 Xeon 1.5GHz computer), and about 1.1 TB of storage space. In result, we would need ~5600 days (i.e. ~ 18 years) of CPU time & ~6 TB of storage space
40
S. Qian PKU program in EUChinaGRID project 40 ISGC’2007, Taipei, 28-3-2007 Summary of WP3 & WP4 Activities at PKU Established a LCG (LHC Computing Grid) Tier-3 site for getting access to the LCG system; Used the above system to have analysed a large MC dataset stored at CNAF in Italy, and have produced some analysis results; Provided configuration files for CMS collaboration in order to generate >2 million prompt J/ events; Installed the CMSSW on EUChinaGrid system (Catania site); Preparing the protein structure analysis in Biology group; Has estimated the computer and storage resources needed to handle the millions of events for Physics group and to analysis the protein structure in Biology group.
41
S. Qian PKU program in EUChinaGRID project 41 ISGC’2007, Taipei, 28-3-2007 Main Problems Availability of biological software (Amber) – Licensing Stability of CMS software (CMSSW) – the suitable J/ event generator is still being tested by CMS collaboration before to be put in production – HLT (High Level Trigger) software Networking – Bandwidth (international traffic is charged by bits) – University policy (3 levels of gateway)
42
S. Qian PKU program in EUChinaGRID project 42 ISGC’2007, Taipei, 28-3-2007 Networking in PKU 3 levels of gateway – Campus network: no charge, only within campus – Domestic gateway: minor monthly charge, unlimited traffic – International gateways: Monthly package -- 90 Yuan/month, unlimited traffic, but disconnected every few hours if no activities Server gateway -- no interruption, but charged by bits
43
S. Qian PKU program in EUChinaGRID project 43 ISGC’2007, Taipei, 28-3-2007 Solutions Use the domestic gateway to connect to IHEP via VPN (V irtual P rivate N etwork ), then to reach the world through the IHEP’s trunk line. Applied and installed the CERNET’s special link to TEIN2. The special cabling was done in 1/2007. – No charge by bits – No periodical interruption.
44
S. Qian PKU program in EUChinaGRID project 44 ISGC’2007, Taipei, 28-3-2007 Network Topology Map The improved route (TEIN2): will upgrade to 2.5 Gbps The backup route
45
S. Qian PKU program in EUChinaGRID project 45 ISGC’2007, Taipei, 28-3-2007 Summary PKU group has set up a very basic Grid site for getting access to the LCG system and for preparing the massive biological protein structure analysis. By using this system, we have engaged in some CMS physics study and got some encouraging results. Some long standing problems of networking have been finally solved with the TEIN2 connection. Much more works are to be done, we must –start the protein structure analysis as soon as the software licence is granted; –be fully prepared for the CMS data analysis when LHC’s first proton beam collision at the end of 2007.
46
S. Qian PKU program in EUChinaGRID project 46 ISGC’2007, Taipei, 28-3-2007 Thank you ( 謝謝 ) !