Download presentation
Presentation is loading. Please wait.
Published byNicole McMahon Modified over 11 years ago
1
GEO AIP-2 Drafting a Plan for AIP-2 Test and Demonstration January 2009
2
AIP-2 Deliverables - 2009 Demonstration –Demonstration of community Scenarios implemented through transverse Use Cases –Demonstrations to be recorded and made available via WWW. Engineering Reports To be considered for GEOSS Best Practice Registry –Community of Practice Scenarios, –Transverse Technology Use Cases –AIP-2 Summary Report Persistent Exemplars –Registered services (continuous operation) with 99% availability (~7 hours down time a month); on a reliable network; plan for performance scaling –Nomination to operational task (AR-09-01a)
3
AIP-2 Test, Integration and Demo 1.Register Resources –Services –Clients 2.Testing at service level –Organized around Technology Use Cases –First, Services indicate they are ready in response to near term call –Then, Clients initiate and lead testing –Concentrate testing in two intensive periods. 3.Testing at the demo level –Organized around SBA Scenarios –Build on the use case testing 4.Demo Capture Important to recognize that testing is already on-going. The testing here is for completeness and for integration.
4
Phasing of Test, Integration and Demo Scenario Development Use Case Development Resource Registration Use Case testing – led by clients Scenario Testing Scenario Capture 1 st Call 2 nd Call Test Log ready Unit Test Period1 Unit Test Period 2 Scenario Testing Demo Capture Event Update Storyboards JANFEBMARAPRMAY
5
Test Log Public place to view status of tests planned and results Plan shows which services are to be tested by specific clients Client testers update log with test results Test Discrepancies with status updated by both clients and service providers.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.