Suggested Changes to Heat Pump Installation Checkout Procedure Baylon, Davis, Strand Ecotope, Inc. 7 June 2005 RTF Meeting Portland, OR.

Similar presentations


Presentation on theme: "Suggested Changes to Heat Pump Installation Checkout Procedure Baylon, Davis, Strand Ecotope, Inc. 7 June 2005 RTF Meeting Portland, OR."— Presentation transcript:

1 Suggested Changes to Heat Pump Installation Checkout Procedure Baylon, Davis, Strand Ecotope, Inc. 7 June 2005 RTF Meeting Portland, OR

2 Installation Check Out – Suggested Changes Eliminate third party charge evaluation requirement (Section 5.4 of PTCS specs) –Field study suggests limited problem –EWEB analysis suggests impact only in extreme cases (exact conditions unknown) –Lab tests show no significant impact until system significantly undercharged –Contractors have resisted this step or tried to short-circuit it

3 Suggested Changes (2) Require an indirect evaluation that also addresses homeowner comfort (and do it in heating mode) –Measure airflow (TrueFlow preferred) – already required in Section 6.4 of RTF and PTCS specs –Measure sensible split at plenums after 15 minutes of heating operation –Calculate output and compare with mfr’s target Require documentation of line set length and adjustments made to charge level (already mentioned in both RTF/PTCS specs) Require documentation of operating pressures and ambient conditions

4 Capacity Measurement Capacity is known from temp split and airflow and can be compared with mfr’s info –Customer/utility have recourse –Installer has data to submit to mfr if system is installed to spec and is not providing expected output

5 Additional On Site Inspection Steps Checklist of components (already detailed in specs) must be completed* –Accumulator (if required) –Crankcase heater (if required) –Filter dryer –Condensate pan(s)/pump Indoor/outdoor thermostat operation must be confirmed and explained to homeowner –Timing of inspection important *could be by non-service tech with some training

6 Additional Considerations ECM blower flow needs to be measured (some board settings produce marginal flow) Cooling season evaluation of charge can be done as before Alternate means of calculating airflow (DB matching, temperature split) are acceptable as long as they are documented