Download presentation
Presentation is loading. Please wait.
Published byMervyn Walsh Modified over 9 years ago
1
EMPG EMERGENCY MANAGEMENT PERFORMANCE GRANT PREPAREDNESS GRANTS BRANCH
2
What is EMPG? O A 50% reimbursable federal grant within the Department of Homeland Security, FEMA administered by Ohio EMA. O This means you will first spend your money then you will reimbursed half of the total amount. O Supports Emergency Management related activities O Don’t be overwhelmed, this presentation will walk through some of the necessary requirements.
3
Guidance (Matching) O EMPG funds can NOT be matched with any other federal funding source O EMPG funds must be matched with county general or other local funds
4
Guidance (Eligibility) O What is eligible? O Salary and fringe O Emergency Management related expenses O General, day-to-day operating costs (utility bills, supplies, etc.) O Public outreach/education O What is NOT eligible? O Food, this means coffee too O Search and Rescue O Hazmat O Fire gear O Clothing O Weapons O Expenses billed to departments other than Emergency Management ** This is not a complete list
5
So what is the process? O It starts with the Grant Agreement O This needs to be signed by your EMA director and the Director of OEMA as a contract for compliance with the grant. O By signing this agreement, you agree to comply with the requirements on the following pages.
6
What’s Next? O Now that you have a signed grant agreement there are a few steps, BEFORE YOU SPEND ANY FUNDS, that you must complete and these differ based on that for which you seek reimbursement.
7
Equipment Section
8
AEL O For equipment to be eligible through the EMPG it must be listed on the Authorized Equipment List that FEMA has posted. O Link: http://www.fema.gov/media- library-data/20130726-1825- 25045- 7138/fema_preparedness_grants_a uthorized_equipment_list.pdfhttp://www.fema.gov/media- library-data/20130726-1825- 25045- 7138/fema_preparedness_grants_a uthorized_equipment_list.pdf
9
EHPs O First is the Environmental and Historical Preservation Survey. O This needs to be completed for any project that will require installation. (even if you are just hanging something on the wall or ceiling)
10
Procurement O So next is the procurement. Make sure to properly procure any items you buy with any preparedness grant is it could jeopardize your funding for the project. O You must document 3 quotes for ANY piece of equipment. O If it is above the threshold for your county or the State’s policy then you will have to adhere to the bidding process. O You may also complete forms for a sole source determination. This is an exception to the 3 quotes rule and it will be scrutinized by OEMA. O Link: Sole Source JustificationSole Source Justification O If you have questions, give the preparedness grants branch a call or email.
11
Personnel Section
12
Personnel O EMA Director must be fulltime staff to be eligible for the EMPG. O Time must be tracked on the time sheet for all personnel submitted for grant reimbursement. O If personnel are funded through several grants then the breakdown between the two will also need to be reflected in the timesheet.
13
Salary O OEMA has a tracking template on our website. O Link: Time Tracking TemplateTime Tracking Template O List the 50% matching fund (ie. General fund) ** This information is only for the hours you work as Emergency Management.
14
Fringe O List the 50% matching fund (ie. General fund) O All benefit expenditures claimed are for the amount the county/city pays; not what was withheld from your paycheck O Check number: this is the check number the city/county paid the contribution not your paycheck number. O Benefit expenses are from the county/city point of view
15
Contract/Training Section
16
Procurement O Contracts/Training must have 3 quotes and if they exceed your county’s or the State’s threshold for bidding then it must be appropriately bid out for all projects according to local, state, or federal guidelines. (whichever is most stringent) O All contracts must align within the grant period and will not be prorated. O You may also complete forms for a sole source determination. This is an exception to the 3 quotes rule and it will be scrutinized by OEMA. O Link: Sole Source JustificationSole Source Justification
17
Other Requirements O Contractors must not appear on the OFCCP Debarred Companies list O Go to SAM.gov and click on the search records tab O Invoices, sign-in sheets, and agendas/curriculum is required for all trainings seeking reimbursement. O You must have a copy of a signed, active contract for the grant performance period and an invoice either with a breakout by hour or by item based on contract deliverables.
18
Submitting for Reimbursement
19
What do we submit? O To receive reimbursement, We will need: O Cash request form O Invoice O Contract (if applicable) O EHP acceptance from FEMA(if applicable) O Proof of 3 Quotes or Sole Source Justification O Copy of your warrant, ledger, or register with the item listed.
20
Invoices O Each expense MUST be supported with copies of original invoices. O Invoices should include: O Company address O Bill To address (to the OEM office) O Itemized invoice; cannot pay off statement or balance forwards O Period or Date of Contract (Must be inside the Performance Period)
21
EMPG Cash Request O Now that you have your 3 quotes or sole source determination approved by OEMA and your EHP you can buy your equipment. O After the equipment has been purchased you will submit the Cash Request with your quotes/sole source and EHP.
23
Ongoing Documentation
24
Quarterlies O Now to track your overall progress in completing your awarded project you will need to complete the Work Plan Update. O This must be submitted by the 10 th day after the end of each quarter. O This form states how much money has been used, how far along the project is, and if there has been any snags.
25
Annual Inventory Control Report O At the end of each calendar year, all counties receiving funds must complete the Annual Inventory Control Report O This form ensures compliance for the tagging and tracking of all inventory purchased using grant funds. O A full physical inventory is required every 24 months.
26
Bi-Annual Strategy Implementation Report (BSIR) O As evidenced by the title, this is a bi- annual reporting system that tracks the status and expenditures of your projects and reports the information to FEMA. O www.reporting.odp.dhs.gov www.reporting.odp.dhs.gov O FEMA does not have a set date to report into the BSIR. Usually they notify the State Grants Administrator and then a message is sent to all sub- grantees that the BSIR is open and what the reporting period will be. O For log-in credentials or your troubleshooting questions please contact the Preparedness Grants Staff.
27
What resources on the OEMA website? O http://ema.ohio.gov/ http://ema.ohio.gov/ O Under the “OHIO EMA BRANCHES” tab select “Preparedness Grants” O Here you can find: O Federal Grant Retention Schedule O Policy O The Grant Gazette O Program Details for each open grant O And, if you click on the “Grants Toolkit” tab on the left side you will find all pertinent forms discussed in this presentation.
28
Questions or Need More Information? O Contact the Preparedness Grants Branch O Grants Administrator: O Kathleen Nelson, Knelson@dps.ohio.gov, 614-799-3836Knelson@dps.ohio.gov O Grants Coordinators: O Joe Haller, Jdhaller@dps.ohio.gov, 330-837- 3078Jdhaller@dps.ohio.gov O Dan Green, Dpgreen@dps.ohio.gov, 614-799- 3820Dpgreen@dps.ohio.gov
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.