Presentation is loading. Please wait.

Presentation is loading. Please wait.

Southeast Region Chapter 2010 Winter Meeting Decatur, Georgia December 15, 2010 SERBCA WINTER MEETING.

Similar presentations


Presentation on theme: "Southeast Region Chapter 2010 Winter Meeting Decatur, Georgia December 15, 2010 SERBCA WINTER MEETING."— Presentation transcript:

1 Southeast Region Chapter 2010 Winter Meeting Decatur, Georgia December 15, 2010 SERBCA WINTER MEETING

2 AGENDA  Welcome chapter members, introduce 2011 board of directors and newly elected board officers  Brief summary of SERBCA 2010 meetings, treasury report and website update  Discuss potential meetings for 2011  Discuss other potential Chapter activities  Presentations ASHE Healthcare Cx Guidelines Building Envelope Diagnostic Techniques Southeast Region Chapter 2010 Winter Meeting Decatur, Georgia December 15, 2010

3 2011 Board of Directors Abdul MomenAtlanta, GA Gary SweattBirmingham, AL Guy CapleLittle Rock, AR Jim MageeLexington, KY John WhitfieldCharlotte, NC Mike HardyAtlanta, GA Mike SaboDecatur, GA Rick SnowdenJackson, MS Rod RaboldChapel Hill, NC SERBCA BCA Rep Tim StaleyLittle Rock, AR Southeast Region Chapter 2010 Winter Meeting Decatur, Georgia December 15, 2010

4 SERBCA Board Officers F or 2011 President – Rod Rabold Vice President – John Whitfield Treasurer – Mike Hardy Secretary – Mike Sabo Southeast Region Chapter 2010 Winter Meeting Decatur, Georgia December 15, 2010

5 SERBCA Activities For 2010 2010 SERBCA Meetings 1)Atlanta, GA 2)NCBC Meeting 3)Little Rock, AR 4)Winter Meeting and Webinar Treasury Report Cash on Hand as of December, 2010 – $32,623 SERBCA Website Update Southeast Region Chapter 2010 Winter Meeting Decatur, Georgia December 15, 2010

6 2011 Potential Meetings Potential Themes  Achieving energy savings in existing buildings through retroCx  Maintaining the benefits of Cx in new and existing buildings that were Cx  Achieving Cx requirements in States with newly mandated Cx requirements  Lessons learned in meeting Cx requirements in States with mandated Cx requirements Potential meeting locations Southeast Region Chapter 2010 Winter Meeting Decatur, Georgia December 15, 2010

7 Other Potential Chapter Activities Local meet and greet evening social gatherings Website resources when the new website is available Joint meetings with other professional groups Southeast Region Chapter 2010 Winter Meeting Decatur, Georgia December 15, 2010

8 Presentations  Tim Staley Comfort Systems USA Energy Services Little Rock, Arkansas  Jim Magee Facility Commissioning Group Lexington, Kentucky Southeast Region Chapter 2010 Winter Meeting Decatur, Georgia December 15, 2010

9 Southeast Region Chapter 2010 Winter Meeting Decatur, Georgia December 15, 2010 SERBCA WINTER MEETING

10 Southeast Region Chapter 2010 Annual Meeting Decatur, Georgia (Energy Ace) Wednesday, December 15, 2010 Tim Staley, PE, CEM, LEED ® AP, HFDP, CPMP Sr. Vice President 650 South Shackleford Road Suite 224 Little Rock, Arkansas 72211 501.320.2725 501.320.2726 Fax 501.366.8178 Mobile tim.staley@comfortsystemsusa.com

11 Southeast Region Chapter 2010 Annual Meeting Decatur, Georgia (Energy Ace) Wednesday, December 15, 2010 History and Current Activity 1 st Qtr. 2010 Final Review of the Guidelines July 2010 Guidelines Published January 2011 Handbook Draft Content Developed 1 st Qtr. 2011 Handbook Final Review July 2011 Handbook Published

12 Southeast Region Chapter 2010 Annual Meeting Decatur, Georgia (Energy Ace) Wednesday, December 15, 2010 Purpose Develop business case for commissioning Healthcare best practices document Address specific needs of healthcare Provide clarity Sample documentation

13 Southeast Region Chapter 2010 Annual Meeting Decatur, Georgia (Energy Ace) Wednesday, December 15, 2010 Contents Introduction to Health Facility Commissioning Health Facility Commissioning Process Predesign Phase Design Phase Construction Phase Transition to Operational Sustainability Postoccupancy and Warranty Phase Retrocommissioning Appendices

14 Southeast Region Chapter 2010 Annual Meeting Decatur, Georgia (Energy Ace) Wednesday, December 15, 2010 Areas of Interest Communicating with the C-Level Commissioning Business Plan Begins with Predesign Independent Commissioning Authority Professional Service Liability of Commissioning Authority Fees for Additional Services

15 Southeast Region Chapter 2010 Annual Meeting Decatur, Georgia (Energy Ace) Wednesday, December 15, 2010 Areas of Interest Additional Commissioning Services Energy Efficiency Goals Utility Management Plan Construction Site Tours Dashboards Maintenance Budget Damper Inspection and Testing Statement of Conditions Building Maintenance Program (CMMS) Measurement and Verification Benchmark Energy Performance

16 Southeast Region Chapter 2010 Annual Meeting Decatur, Georgia (Energy Ace) Wednesday, December 15, 2010 Questions

17 Southeast Region Chapter 2010 Winter Meeting Decatur, Georgia December 15, 2010 SERBCA WINTER MEETING

18 Southeast Region Chapter 2010 Annual Meeting Decatur, Georgia (Energy Ace) Wednesday, December 15, 2010 Jim Magee President, Facility Commissioning Group 158 Burt Road Lexington, Kentucky 40503 859-278-5552 859-278-6501 Fax 859-221-5838 Mobile jim@facomgrp.com Building Envelope Commissioning Diagnostic Techniques

19 Southeast Region Chapter 2010 Annual Meeting Decatur, Georgia (Energy Ace) Wednesday, December 15, 2010 Overview of References Cx NIBS Guideline 3 Analysis NISTIR 4821 & NISTIR 7238 Building Air Leakage ASTM E779 & ASTM E1827 Thermal Imaging ASTM C1060 & ISO 6781 Water Spray Test AMMA 501.2-03

20 Southeast Region Chapter 2010 Annual Meeting Decatur, Georgia (Energy Ace) Wednesday, December 15, 2010 National Institute of Building Sciences Guideline 3 Exterior Enclosure Technical Requirements for the Commissioning Process For use with: ASHRAE Guideline 0 – 2005 The Commissioning Process Quality-oriented process for achieving, verifying, and documenting performance Describes technical requirements for bldg. Cx

21 Southeast Region Chapter 2010 Annual Meeting Decatur, Georgia (Energy Ace) Wednesday, December 15, 2010 National Institute of Building Sciences Guideline 3

22 Southeast Region Chapter 2010 Annual Meeting Decatur, Georgia (Energy Ace) Wednesday, December 15, 2010 National Institute of Standards and Technology NISTIR 4821: Envelope Design Guidelines for Federal Office Buildings: Thermal Integrity and Airtightness NISTIR 7238: Investigation of the Impact of Commercial Building Envelope Airtightness on HVAC Energy Use

23 Southeast Region Chapter 2010 Annual Meeting Decatur, Georgia (Energy Ace) Wednesday, December 15, 2010 NISTIR 4821 & NISTIR 7238

24 Southeast Region Chapter 2010 Annual Meeting Decatur, Georgia (Energy Ace) Wednesday, December 15, 2010 American Society for Testing and Materials ASTM E779: Standard Test Method for Determining Air Leakage Rate by Fan Pressurization ASTM 1827: Standard Test Methods for Determining Airtightness of Buildings Using an Orifice Blower Door

25 Southeast Region Chapter 2010 Annual Meeting Decatur, Georgia (Energy Ace) Wednesday, December 15, 2010 ASTM E779 & ASTM E1827

26 Southeast Region Chapter 2010 Annual Meeting Decatur, Georgia (Energy Ace) Wednesday, December 15, 2010 American Society for Testing and Materials ASTM C1060: Standard Practice for Thermographic Inspection of Insulation Installations in Envelope Cavities of Frame Buildings Infrared imaging systems used for qualitative inspection of building walls, ceilings, roofs and floors

27 Southeast Region Chapter 2010 Annual Meeting Decatur, Georgia (Energy Ace) Wednesday, December 15, 2010 International Organization for Standardization ISO 6781: Thermal insulation-Qualitative detection of thermal irregularities in building envelopes-Infrared method Qualitative method for thermographic examination to determine irregularities in building envelopes

28 Southeast Region Chapter 2010 Annual Meeting Decatur, Georgia (Energy Ace) Wednesday, December 15, 2010 ASTM C1060 & ISO 6781

29 Southeast Region Chapter 2010 Annual Meeting Decatur, Georgia (Energy Ace) Wednesday, December 15, 2010 American Architectural Manufacturers Association AMMA 501.2-03: Quality Assurance and Diagnostic Water Leakage Field Check of Installed Storefronts, Curtain Walls, and Sloped Glazing Systems Type B-25, #6.030 brass nozzle with a 1/2" FPT as manufactured by Monarch Manufacturing Works, Inc./Newton Tool & Mfg. Company

30 Southeast Region Chapter 2010 Annual Meeting Decatur, Georgia (Energy Ace) Wednesday, December 15, 2010 AMMA 501.2-03

31 Southeast Region Chapter 2010 Annual Meeting Decatur, Georgia (Energy Ace) Wednesday, December 15, 2010 Questions


Download ppt "Southeast Region Chapter 2010 Winter Meeting Decatur, Georgia December 15, 2010 SERBCA WINTER MEETING."

Similar presentations


Ads by Google