Construction of the new UNC dual Aerosol chamber Constructed in 2002 and took about 1 year to complete The dual chamber is Quonset hut in design, width = 8.53 m length = 9.75 m height = 3.89 m The total chamber volume is ~270m 3
2
The walls of the chamber are made of 5 mil FEP Teflon film and are attached on 1.22 m centers to 4.81 cm o.d. round tubular metal frames that form the superstructure of the chamber.
3
A suspended 5 mil FEP Teflon film (type C) curtain, (Livingstone Plastics, Charlotte, NC) bisects the chamber to form two chamber halves.
4
Building a platform
5
Building the frame
6
The small superstructure frame creates very little shadowing of the sunlight entering the chamber and also provides a very durable structure.
7
Orientation to the sun is very important
8
Frame attachment to platform
9
Sealing the joints
10
Bracing
11
Floor
12
Intake ducts
13
Mixing Fans 13
14
Entry door
15
Exhaust port
16
Attaching Film
18
Finished
19
Three UNC chambers
20
Injection of liquids
21
Sampling directly under chamber
22
GAS phase NO-O 3 titration
23
Auto sampling GCs for VOC analysis
Similar presentations