1
LABORELEC © LABORELEC – 2006 – 1 dr. ir. Marcel Didden marcel.didden@laborelec.com 0032 - 479 77 01 35 Choosing the appropriate voltage dip mitigation device LABORELEC
2
© LABORELEC – 2006 – 2Content 1.Introduction 2.Mitigation equipment 3.Dip immunization capability 4.Other aspects 5.Conclusion
3
LABORELEC © LABORELEC – 2006 – 3 1. Introduction
4
LABORELEC © LABORELEC – 2006 – 4 Voltage dips / sags Dips are mainly caused by short circuits > 10% < 2 s Dip
5
LABORELEC © LABORELEC – 2006 – 5 Cost per process outage (cases Laborelec 2004/2005) 100 000
6
LABORELEC © LABORELEC – 2006 – 6 Mitigation possibilities Options a, b and d are most interesting, but not always possible Sometimes c is the only option Installing a UPS is the easiest way to mitigate dips but too expensive This presentation analyses alternatives
7
LABORELEC © LABORELEC – 2006 – 7 Mitigation equipment 2.
8
LABORELEC © LABORELEC – 2006 – 8 Flywheel
9
LABORELEC © LABORELEC – 2006 – 9 Static UPS
10
LABORELEC © LABORELEC – 2006 – 10 Dynamic Voltage Restorer
11
LABORELEC © LABORELEC – 2006 – 11 Statcom
12
LABORELEC © LABORELEC – 2006 – 12 Shunt connected synchronous motor
13
LABORELEC © LABORELEC – 2006 – 13 Transformerless series injection
14
LABORELEC © LABORELEC – 2006 – 14 Dip immunization capability 3.
15
LABORELEC © LABORELEC – 2006 – 15 Dip distribution
16
LABORELEC © LABORELEC – 2006 – 16 Immunization level
17
LABORELEC © LABORELEC – 2006 – 17 Immunization level
18
LABORELEC © LABORELEC – 2006 – 18 Other aspects 4.
19
LABORELEC © LABORELEC – 2006 – 19 Size - : only > 1MW = : only > 100 kW +: also < 100 kW Purchase cost - : > 250 €/kVA = : 150 – 250 €/kVA +: < 150 €/kVA Maintenance -: annual maintenance required +: no annual maintenance required
20
LABORELEC © LABORELEC – 2006 – 20 Efficiency +: losses <0,5% S rated =: losses 0,5-2% S rated -: losses >2% S rated Harmonics, reactive power =: no influence +: positive influence Reaction time +: reaction or activation transient < 1 ms =: transient 1-5 ms -: transient > 5 ms
21
LABORELEC © LABORELEC – 2006 – 21 Summary
22
LABORELEC © LABORELEC – 2006 – 22 Conclusion 5.
23
LABORELEC © LABORELEC – 2006 – 23 Most cost efficient DVR without energy storage Transformerless series injector If harmonics are an issue Synchronous motor If all sags have to be dealt with Flywheel or static UPS further information on manufacturers or concrete case studies marcel.didden@laborelec.com