Presentation is loading. Please wait.

Presentation is loading. Please wait.

BULGARIAN APPROACH TO THE BAT IN THE IPPC PERMITTING BOYKO MALINOV MINISTRY OF ENVIRONMENT AND WATER BULGARIA.

Similar presentations


Presentation on theme: "BULGARIAN APPROACH TO THE BAT IN THE IPPC PERMITTING BOYKO MALINOV MINISTRY OF ENVIRONMENT AND WATER BULGARIA."— Presentation transcript:

1 BULGARIAN APPROACH TO THE BAT IN THE IPPC PERMITTING BOYKO MALINOV MINISTRY OF ENVIRONMENT AND WATER BULGARIA

2 COMPETENCES THE MINISTRY THE EXECUTIVE AGENCY THE REGIONAL INSPECTORATES THE RIVER BASIN DIRECTORATES

3 INTEGRATED PERMITS AND BAT PREVENTIVE LEGISLATION PREVENTIVE ACTIVITIES BASED ON BAT PERMIT CONDITIONS BASED ON BAT BREFs IN THE PERMITS SITE SPECIFIC BAT BREF DATA BASE NATIONAL GUIDELINES DATA BASE

4 BREF GUIDELINES INSUFFICIENCES IN: BREF KNOWLEDGE BAT DETERMINATION GUIDANCE USE OF DIRECTIVE’S ANNEX 4 CONSIDERATIONS FAST “FULL SWING” IMPLEMENTATION APPLICATION PREPARATION PRESSURE ISSUE OF THE RELEVANT BREFs

5 PLANNING OF GUIDELINES CRITERIA APPLIED NUMBER OF THE OPERATIONAL INSTALLATIONS COMPLEXITY OF THE INSTALLATIONS DEADLINES FOR APPLICATION POTENTIAL ENVIRONMENTAL IMPACT CURRENT LEVEL OF MANAGEMENT

6 PLANNING OF GUIDELINES ISSUED GUIDELINES ORGANIC CHEMISTRY INORGANIC CHEMISTRY LARGE COMBUSTION PLANTS SURFACE TREATMENT IN VATS OVER 30m3 CEMENT CLINKER PRODUCTION

7 PERMIT’S GUIDELINES ISSUED: APPLICATION PREPARATION/ALTERNATIVES COMPARISON PERMIT ISSUE – PROCEDURE PERMIT’S CONTROL + ANNUAL REPORT BROCHURE IN PREPARATION: MINIMUM SCOPE OF EACH CONDITION

8 EMISSION LIMIT VALUES MANDATORY SECTORAL LIMITS DISPERSION MODELS BAT CAPABILITIES

9 BULGARIAN APPROACH TO BAT IN THE PERMITTING PRESENTED BY BOYKO MALINOV


Download ppt "BULGARIAN APPROACH TO THE BAT IN THE IPPC PERMITTING BOYKO MALINOV MINISTRY OF ENVIRONMENT AND WATER BULGARIA."

Similar presentations


Ads by Google