US Army Corps of Engineers BUILDING STRONG ® Walla Walla District SAME 21 June 2011 David A. Caldwell, Lieutenant Colonel Commander and District Engineer
2
BUILDING STRONG ® Agenda Overview Budget Project Focus Areas A-E and Planning Services Contract Status 2011 Industry Day Events
3
BUILDING STRONG ® Walla Walla District Overview Civil Works District ► Support to the Nation (OCO, NPT, & EM) ► Environmental Stewardship ► Hydropower ► Navigation ► Flood Damage Reduction ► Recreation Workforce: 823 Employees ► 3 Military Officers ► 187 Women ► 56 Minorities ► 150 Engineers ► 113 Registered Professionals ► 270 Wage Grade Employees Boundaries include portions of WA, OR, ID, WY, NV, UT Business Lines
4
BUILDING STRONG ® Walla Walla District Covers 107,000 sq mi Includes parts of six States Civil Works Boundary focused on the Snake River Basin Regulatory Boundary is Idaho borders Mill Creek Dam (Bennington Lake) Mill Creek Dam (Bennington Lake) McNary Lock & Dam Ice Harbor Lock & Dam Lower Monumental Lock & Dam Little Goose Lock & Dam Lower Granite Lock & Dam Lower Granite Lock & Dam Dworshak Dam Lucky Peak Dam
5
BUILDING STRONG ® District Infrastructure Over $2.5 Billion of infrastructure assets including: ► Hydropower Facilities ► Navigation Facilities ► Flood Risk Reduction Reservoirs and Levee System ► Recreation Sites ► Environmental mitigation
6
BUILDING STRONG ® Columbia River Fish Mitigation $40.7 Million Operations & Maintenance $23.7 Million Fish Ladders Fish Screens Transportation Program Spill Fish Collection Removable Spillway Weir Fish Hatcheries Fish Counting $64.4 Million in FY11 Fish Program
7
BUILDING STRONG ® NWW Program Overview FY2002 – FY 2011
8
BUILDING STRONG ® Walla Walla District FY 12 Anticipated Budget CG Projects CAP GI FCCE Regulatory O&M Approp BPA Joint BPA Large Cap Work for Others BPA Hydro O&M Joint $193.6 million Program 57% from BPA
9
BUILDING STRONG ® Project Focus Areas Environmental Restoration Projects Dam Safety Program Upcoming O&M Projects Upcoming CRFM Projects and Studies Upcoming BPA Large Capital Improvements
10
BUILDING STRONG ® Environmental Restoration Projects & Studies Walla Walla River GI Feas Study, WA & OR Boise River GI Feasibility Study, ID Big Wood River GI, vicinity of Haley, ID Fort Hall GI, Pocatello, ID Weiser River GI, Weiser, ID Twin Falls Wetland Development (Sec 206) Bennington, WW, WA (Sec 1135) Boise River at Eagle Island, ID (Sec 1135) Portnuef River, Pocatello, ID (Sec 1135) Lower Snake River Fish & Wildlife Comp Plan Little Wood River, Gooding, ID
11
BUILDING STRONG ® Dam Safety Program Develop, Prepare, and Implement Interim Risk Reduction Measures (IRRMs) Construction ► Levee Vegetation Removal at Mill Creek and McNary ► Decommission Sluice Gate in Intake Tower at Lucky Peak Studies ► Revise Emergency Action Plan at Mill Creek ► Certify Diversion Dike at Mill Creek ► Upgrade Water Seepage Monitoring System at Mill Creek ► Update the Probable Maximum Flood and Generate Water Surface Profile ► Perform Potential Failure Mode Analysis
12
BUILDING STRONG ® Construction ► Continue ongoing activities at Lower Monumental to repair Navigation Lock wall ► Rock replacement at Jackson Hole Levees ► Dam Safety DSAC Interim Risk Reduction Measures at Mill Creek and Lucky Peak Upcoming O&M Projects
13
BUILDING STRONG ® Construction ► Juvenile Bypass Outfall Relocations at McNary ► Juvenile Bypass Outfall Relocations at Lower Monumental ► Prepare designs for new adult ladder entrance at McNary and Ice Harbor that incorporates lamprey passage. Studies ► Configuration and Operation Plans for Fish ► Performance Verification Testing ► Lamprey Passage Studies ► Avian Predation Studies Upcoming CRFM Projects and Studies
14
BUILDING STRONG ® Large Capital Improvements ► McNary Fishway Crane 9 and 10 Replacement ► McNary Potable Water System Upgrade ► McNary Heat Pumps and Controls Replacement ► Ice Harbor DC System and Low Voltage Switchgear Upgrades ► Little Goose Intake Gantry Crane Replacement ► Dworshak National Fish Hatchery Boiler Controls Replacement
15
BUILDING STRONG ® TYPEFIRMSIZETIMESTATUS Multi-Discipline Design Services McMillen, LLC $1M/yr, $5M total Base with 4 Options Base Year Cost Engineering (large) Project Time & Cost $90M total Base with 4 Options Option Year 1 Cost Engineering (small business) MOCA Systems $2 M/yr, $10M total Base with 4 Options Option Year 1 Survey (primary Hydro) David Evans & Associates $2M/yr, $10M total Base with 4 Options Base Year Survey (primary Hydro)Terrasond $2M/yr, $10M total Base with 4 Options Base Year Existing NWW A-E Contracts (IDIQ) For information contact Bob Williams – 509-527-7539
16
BUILDING STRONG ® TYPEFIRMSIZETIMESTATUS Multi-Discipline Design Services Jacobs $2M/yr, $10M total Base with 4 Options Base Year Multi-Discipline Design Services McMillan $1M/yr, $5M total Base with 4 Options Base Year Multi-Discipline Design Services Harbor $1M/yr, $5M total Base with 4 Options Base Year Survey (primary land)Rogers Surveying $1 M/yr, $3M total Base with 2 Options Final Year Multi-Discipline Planning Services HDR Engineering, Inc $1M/yr, $3M total Base with 2 Options Final Year Tetra-Tech EC, Inc $1M/yr, $3M total Base with 2 Options Final Year Existing NWW A-E Contracts (IDIQ) For information contact Bob Williams – 509-527-7539
17
BUILDING STRONG ® Anticipated Future NWW A-E Contracts TYPEAMOUNTTIMEFRAME Multidiscipline Design Services 3 firms (large) IDIQ $2 M/year, $10M total, Base w/ 4 options Firms selected for negotiation, expect award mid July Cost Engineering A-EIDIQ $1 M/yr, $240M total, Base w/4 options Anticipated award by September 2011 Land SurveyIDIQ $1 M/yr, $5M total, Base w/4 options Anticipated award by September 2011 For information contact Bob Williams – 509-527-7539
18
BUILDING STRONG ® Anticipated Future NWW IDIQ Contracts TYPEAMOUNTTIMEFRAME Planning and Environmental Services 2 firms (large) MATOC (Regional) IDIQ $2 M/year, $10M total, Base w/4 options Synopsis - April Advertise - June Evaluate - July Award - August Planning and Environmental Services 2 firm (small business) MATOC (Regional) IDIQ $1 M/yr, $5M total, Base w/4 options Synopsis - April Advertise - June Evaluate - July Award - August Cultural Resource Services 2 firm (small business) MATOC (Regional) IDIQ $500K/yr, $2.5M total, Base w/4 options Synopsis - April Advertise - June Evaluate - July Award - August For information contact Rebecca Kalamasz – 509-527-7277
19
BUILDING STRONG ® Anticipated Future NWW IDIQ Contracts TYPEAMOUNTTIMEFRAME Asbestos and Lead Paint Removal IDIQ $1 M/year, $5M total, Base w/4 options Award - July For information contact Ruthann Haider– 509-527-7201
20
BUILDING STRONG ® Outreach events recently held for local industry ► Walla Walla, WA was held on 28 April 2011 ► Boise, ID was held on 12 May 2011 Purpose ► Provided industry with the tools needed to do business with USACE ► Provided industry an opportunity to showcase capabilities to USACE ► Allowed an opportunity for dialogue Future outreach events being planned for FY12 ► Introducing an advanced version as well 2011 Industry Day Events For information contact Scott Beckstrand– 509-527-7434
21
BUILDING STRONG ® POC Info Small Business Deputy – Scott Beckstrand Phone: 509-527-7434 Email: scott.v.beckstrand@usace.army.mil Walla Walla District: http://www.nww.usace.army.mil Walla Walla District Solicitations: https://www.fbo.gov Keyword/Solicitation #: W912EF Twitter: http://twitter.com/wwcontracting Facebook: http://www.facebook.com/pages/WallaWallaUSACE- Contracting/148523221852286?sk=app_2309869772
22
BUILDING STRONG ® US Army Corps of Engineers Walla Walla District Serving our Community, our Nation, the World