Download presentation
Presentation is loading. Please wait.
Published byAlex Moser Modified over 10 years ago
1
Sponsored by the National Science Foundation Cluster D Outbrief GENI Engineering Conference 5 Seattle, WA July 22, 2009 www.geni.net
2
Sponsored by the National Science Foundation 2 March 31, 2009 Cluster D Projects ORCA-BEN (RENCI, Duke) –ORCA control framework, clearinghouse –BEN experimental optical network DOME (UMass – Amherst) –Outdoor, mobile testbed ViSE (UMass – Amherst) –Wireless sensor and actuator network Kansei (Ohio State, Wayne State) –Sensor networks Embedded Real-Time Measurements –Cross-layer, real-time measurements –Recently joined cluster, ready to begin prototyping phase
3
Sponsored by the National Science Foundation 3 March 31, 2009 Cluster D Tasks to End of Spiral 1 Overall: on track to end of Spiral 1 ORCA –Release ORCA code (completed) –Setup clearinghouse at RENCI (due 8/1, on track)
4
Sponsored by the National Science Foundation 4 March 31, 2009 Cluster D Tasks to End of Spiral 1 Each substrate project (BEN, DOME, ViSE, Kansei) –Setup local container of ORCA actors, including broker (completed) –Formulate resource description and policies for substrate (completed) –Integrate researcher portal and substrate with ORCA actors (completed) (BEN includes stitching with NLR) –Move broker to RENCI (on track, due 8/1 – 9/1) (Kansei has separate broker at Wayne State) –Layer 2 connection to I2 backbone (due 10/1, some issues) (BEN has connection to NLR) –Allow other GENI researchers (due 10/1, on track)
5
Sponsored by the National Science Foundation 5 March 31, 2009 Cluster D Spiral 2 Roadmap Process Aim for GENI Spiral 2 goals –Most important: Live Experiments Roadmap for Spiral 2 completed Each item rated –Critical –Important –Not Important
6
Sponsored by the National Science Foundation 6 March 31, 2009 ORCA Spiral 2 Roadmap Items ORCA code (one C, four I items) ORCA clearinghouse (one C, one I items) Resource description mechanisms (C) (early Spiral 2) Resource discovery mechanism (I) (mid Spiral 2) VLAN connections to I2 (I) (early Spiral 2) VLANs stitched between multiple testbeds (I) (mid Spiral 2) Experiment control tools (portals) and Srvc Mgr for experiments across multiple testbeds (I) Interface on Srvc Mgr for external exp cntrl tools (I) Instrumentation improvements, repository (I) (end Spiral 2)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.