Patrick Coleman-Smith CCLRC Daresbury 1 AGATA Digitiser Summary February 2005 Patrick J. Coleman-Smith For the Digitiser Technical Group I.Lazarus Daresbury P.MedinaIReS R.Baumann IReS C.Santos IReS M.Chambit IReS J.Thornhill Liverpool D.Wells Liverpool
2
Patrick Coleman-Smith CCLRC Daresbury 2 Revised Mechanical Structure Global Clock internal delivery Laser link trial report TNT2 tests Slow Control Cost Schedule Some Remaining Questions
3
Patrick Coleman-Smith CCLRC Daresbury 3 Previous Mechanical Structure
4
Patrick Coleman-Smith CCLRC Daresbury 4 New Mechanical Assembly Mechanical Constraints Distance to the Detector 5 Metres Power Dissipation around 400W Mechanically dependant on the detector array. Use Water Cooling New arrangement of PCBs
5
Patrick Coleman-Smith CCLRC Daresbury 5 Structure of the Digitiser: Cooling, and mechanics
6
Patrick Coleman-Smith CCLRC Daresbury 6 Internal Global Clock Distribution Clock reference input from the Pre- Processor core board using Laser link. The idea is to use Sinusoidal clock through a Jitter smoother and a Mini-circuit splitter Distribute to the Flash ADCs via cable. Passive Filter to transform the square wave input to a sinusoidal signal
7
Patrick Coleman-Smith CCLRC Daresbury 7 Internal Global Clock distribution schematic Under Development at Liverpool University
8
Patrick Coleman-Smith CCLRC Daresbury 8 Laser Trial Test and Results Designed the Laser Trial board with four Laser modules. Used Xilinx recommended PCB connection parameters for the 2Gbit/sec connections from the Virtex2Pro BGA to the Laser modules. Test connection to a Xilinx Development board: 16 bit data from counter incrementing at 100Mhz Three channels operating independently. Receiver tracks the data, checking each value received. Transmitter and receiver share the same clock. Ran for 8 days with no errors. 6.9 x 10 13 Transfers per link
9
Patrick Coleman-Smith CCLRC Daresbury 9 Laser Trial Test Block Diagram
10
Patrick Coleman-Smith CCLRC Daresbury 10 Laser Trial Board Laser Transmitter Virtex2Pro 100Mhz clock input Analog Inspection
11
Patrick Coleman-Smith CCLRC Daresbury 11 Laser Trial Setup
12
Patrick Coleman-Smith CCLRC Daresbury 12 TNT2 Tests 1
13
Patrick Coleman-Smith CCLRC Daresbury 13 TNT2 Tests 2
14
Patrick Coleman-Smith CCLRC Daresbury 14 Slow Control External interfaces: Xport module Galvanically isolated serial link over 10/100baseT physical layer. Experiment control for the digitiser. Laboratory and diagnostic access. Internal interfaces : Serial link Link is Clock, Data, Frame signals Simple protocol developed at Liverpool. Connects all FPGAs using Star topology. Requests all generate an Acknowledge. Timeout with reset of link. Long write to allow re-program of FPGA.
15
Patrick Coleman-Smith CCLRC Daresbury 15 Prototype Digitiser : 45,000 Euros Further Digitisers: 30,000 Euros Cost Estimates
16
Patrick Coleman-Smith CCLRC Daresbury 16 Schedule
17
Patrick Coleman-Smith CCLRC Daresbury 17 Some Remaining Questions 1. Offset Control link protocol 2. Segment and Core data link start-up protocol, and how to respond to failures. 3. Global clock link start-up and calibration 4. Pre-Amp Interface - Pulser Control 5. Slow Control External interface protocol 6. Mechanical mounting on the Apparatus
18
Patrick Coleman-Smith CCLRC Daresbury 18 Signal interconnections
19
Patrick Coleman-Smith CCLRC Daresbury 19 Front panel clock interconnects
20
Patrick Coleman-Smith CCLRC Daresbury 20 Main Structure of the digitiser housing
21
Patrick Coleman-Smith CCLRC Daresbury 21 Block Diagram of the Digitiser
22
Patrick Coleman-Smith CCLRC Daresbury 22 Segment board block diagram
23
Patrick Coleman-Smith CCLRC Daresbury 23 DC-DC graphs
24
Patrick Coleman-Smith CCLRC Daresbury 24 Clock Test boards
25
Patrick Coleman-Smith CCLRC Daresbury 25 Slow control test board