MICE TECHNICAL UPDATE & ISIS/RAL PLANS
2
Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge
3
RAL & ISIS ISIS Harwell RAL
4
Plant…. Control room… Electronics…. Location
5
ISIS Ring
6
Experimental Hall Hall: L = 47 m W = 12 m H = 8 m S = 564 m 2 V = 4512 m 3 Two overhead cranes (8 tonnes each)
7
Mice Hall Existing Area & Beam Line -- is still there - as seen in Summer -- Beam Line used to end of year
8
Mice Layout
9
Technical Update & Issues Beam Line RF System Absorbers Magnets & Cryogenics Detectors Infrastructure & Layout RAL & ISIS Perspectives Programme Expected Progress
10
MICE Layout
11
Beam Line P < 400 MeV/c Rejection of protons and pions <10% few muons per s Two solutions: –solenoid »cryogenics availability »release by PSI –quadrupoles
12
Purity
13
Performance Rate depends on muon momentum: e.g. at 200 MeV/c 3000 / ms for solenoid ~300 /ms in quadrupole (assumed a Ti wire target: 1cm long and 4mm Ø) Purity should be better than 90% against scattered protons
14
RF System Cooling Channel Envelope Absorber Tuning Bellows RF Cavity Cavities Raft Solenoid Magnet 1 MW per cavity 8MW total Low Duty Factor 1-2 ms 1-10 Hz average power ~1kW/Hz
15
~ RF Drive TH116 TH781 RS2058 EX SPS 7651 EX RAL LEVEL CONTROL SOURCE OTHER DRIVE CHAIN 10mW4kW 40kW 400kW4MW DRIVE TO 4 CAVITIES VIA PHASE SHIFTERS AND 70db COUPLERS POWER SPLITTERS AND CIRCULATORS 40 kV20 kV 12kV 5kV R.A. Church RAL - a possible scheme
16
Absorber I Liquid Hydrogen – Major safety issue –ISIS Liquid Hydrogen Moderator
17
Absorber II
18
Absorber III
19
Absorber IV
20
Magnets & Cryogenics Principle Issues – Fringe Fields – Cryogenic Requirements Blue contours: 10 mT Orange: 0.5 mT
21
Detectors Issues: SiFi - Large cyro cooling needed for VLPCs TPG – HV & flamable gas (next to Lig.H cell)
22
Infrastructure Plant:Electrical Power Cooling Power Cryogenic System Hydrogen Delivery & Handling Installation phased build of the experiment
23
ISIS Perspective Critical Issues: Beam Line Long Shutdown Break into ISIS Synchrotron from MICE Hall Have Shielding available+ Have Stands available Competes with other ISIS projects 300 A upgrade* Second Target Station* RFQ Installation delivery of contracted neutron amp.hours * work in synch. vault +2 nd target station – friend or foe?
24
ISIS Schedule
25
Expected Progress Proposal submitted expect the review to take place Mid Feb till May (?) - international review panel MICE is part of the UK’s Science road map - but funds are not yet allocated Internal Review green light following international rp Management & Oversight Structure(s) need to be in place