Presentation is loading. Please wait.

Presentation is loading. Please wait.

Ph:08933 229556,

Similar presentations


Presentation on theme: "Ph:08933 229556,"— Presentation transcript:

1 Ph:08933 229556, Email: president.bcbs@gmail.com

2

3 1

4 2

5 3 Location

6 4

7 J 962 I 229 H 935 G 350 F 385 M 630 302 502 E A B 151 198 Q3 712 200 P9 6020 1466 1920 948 C2 420 148 225 215 N 158 O 2963 225 789 489 585 P1 S1 203 L3 49 M3 166 K3 423 J3 206 235 I3 H3 733 G3 394 210 F3 E3 314 D3 470 C3 A3 305 425 261 1038 Z2 Y2 X2 W2 505 V2 300 M2 N2 O2 P2 H2 J2 K2 L2 553 444 SCALE: 1 CM = 2 ½ CHAINS 5 SITE DRAWING Site Drawing

8 6 Photographs

9 7

10 8

11 9

12 10

13 11 Land Availability

14 12

15 13 Layout Requirements

16 14

17 - Adequate - Clean and Clear - Potable - 24 Hours Supply - Tap Running Water WATER SUPPLY 15 Amenities

18 - Ground water - Municipal water - Independent near by Water source - Desalination of sea water exploration OF WATER SOURCE Desalination of sea water 16 Amenities

19 - 24 Hours Uninterrupted Supply - Three Phased - Stable - Underground Cable Supply POWER SUPPLY 17 Amenities

20 SOURCES OF POWER - State Electric Supply - Wind Power - Solar Based - Diesel Generated - Wastage Based - Stand by System 18 Amenities

21 SEWAGE - Underground - Update Technology - Recycling 19 Amenities

22 Garbage and Wastage Disposal System 20 Amenities

23 Telecommunications 21 Amenities

24 Security 22 Amenities

25 Open Spaces 23 Amenities

26 Crz area development 24 Amenities

27 25

28 26 Civil Infrastructure

29 27

30 * * * * * * * * * * * * * * * * 28 Infrastructure Facilities

31 29

32 30 Housing

33 31

34 32 Estimated Cost

35 33

36 Sl. No Item Description  Expected Dev. charges per Sq.yard (in Rs.) MinimumMaximum 1Land conversion fee to the Govt. 20 2CRZ Study and Approval 20 3Land Survey and Site Plan 20 40 4Layout Plan Study and Preparation 20 60 5VUDA Approval for the Layout 60 6Compound Wall 100 7Civil Works (Leveling, Roads, Drains etc.) 500 700 8Water Supply 250 9Power Supply 250 10Sewage System 375 11Essential Amenities (Telecommunications, Security, Horticulture) 100 12Infrastructure Facilities (Community Hall, Office Building, Recreation Centre etc.) 500 740 13Temple 60 14Maintenance Fund (Refundable) 200 15Contingency provision 25 Total25003000  Members pay only the actual cost incurred in proportion to the Plot size.  The indications are rough estimates to be firmed up by the Consultants first and Work Order thereon.  The indications are at current price level and applicable to old Members only. 34 Cost Data Sheet

37   35 Relative Costs

38 36

39 37 Methodology

40 38 Methodology

41 39

42 40 Monitoring

43 41

44 42 Finance Committee

45 43 Finance Committee

46 44 Approvals

47

48 Ph:08933 229556, Email: president.bcbs@gmail.com


Download ppt "Ph:08933 229556,"

Similar presentations


Ads by Google