Download presentation
Presentation is loading. Please wait.
Published byNora Parks Modified over 9 years ago
1
Possible 3PP2 Changes Ed Tiedemann Chair, 3GPP2 TSG-C tsgc_chair@3gpp2.org 6 August 2012
2
The 3GPP2 leadership has been exploring the restructuring of the TSGs 2 Possible Restructuring of TSGs Want to broaden the discussion with entire community to collect feedback and identify issues Leadership elections in December; thus, if changes are to be made, would be logical time Any decision would likely be at the October SC meeting in Sapporo
3
The objectives are: Ensure 3GPP2 continues to support the development of technical specifications for the cdma2000 community in a more effective manner. Optimize the meetings by leveraging the synergies in the work between TSG-A and TSG-C, and between TSG-S and TSG-X Realize possible cost savings in terms of actual meeting requirements (number of rooms, secretarial support, etc.) 3 Possible Restructuring of TSGs
4
4 Existing TSG-C Organization
5
5 Existing TSG-A Organization
6
6 Merged Organization WG1 Program Management WG2 Femto IOS WG3 CDMA IOS
7
TSG-A Program Management aspects (TSG-A WG1) would merge into TSG-C WG1 TSG-A Femto IOS (TSG-A WG2) and TSG-A CDMA IOS (TSG-A WG3) would merge into WG5 There could be additional restructuring in legacy TSG-C aspects if they resulted in additional improvements Currently should determine whether any serious problems –May require some thinking though how a merged TSG-A and TSG-C would operate and identify any issues –SC meeting in October would make decision on whether to merge –Any decisions on how a merged TSG A and C would actually work can be done after the agreement on the merging. These would be internal to the merged TSG. 7 Merger Aspects
8
Documents would maintain C.x or A.x nomenclature Any new document that is created would use a C.x or an A.x format, depending upon which is appropriate It is expected that WG5 would need about 12 hours/week To keep costs down, trying to fit into a total of six meeting rooms for all TSGs during f2f meetings –TSG-C would get three rooms plus perhaps some of a 4 th room (maybe needed when SWG4.2 meets) 8 Merger Aspects (continued)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.