Presentation is loading. Please wait.

Presentation is loading. Please wait.

Motivation 1.Application resources setup – make it easy 2.Transform PRAGMA grid – add on demand –Continue using Grid resources –Add cloud resources Current.

Similar presentations


Presentation on theme: "Motivation 1.Application resources setup – make it easy 2.Transform PRAGMA grid – add on demand –Continue using Grid resources –Add cloud resources Current."— Presentation transcript:

1 Motivation 1.Application resources setup – make it easy 2.Transform PRAGMA grid – add on demand –Continue using Grid resources –Add cloud resources Current –SDSC –AIST –NBCR Future –ASTI (Philippine) –NCHC –Osaka University

2 Working steps Hosting services setup SDSC, AIST, NBCR, … VM setup for baseline system Rocks VM baseline system (SDSC) VM setup with applications Use the VM baseline system Build application VMs Avian Flu Grid VM (SDSC, NBCR) VM replication manually AFG VM from SDSC to AIST and NBCR VM replication automation Fast live-migration systems and scheme (AIST leads research)

3 Opal2 User Interface Resource Manager Meta Scheduler Grid Resources CSF 4 Scheduling : workflow job array Job Input/Output files: stage in stage out Grid sites Generate RSL files NBCR VM hosting server AFG VM replica 3 VM Replication Experiment http://goc.pragma-grid.net/wiki/index.php/VC-replication-2 AFG VM original AIST VM hosting server AFG VM replica 2 VM replication VM hosting server: Rocks 5.3 Xen roll VM change: hostname, IP & compute nodes system network configuration Globus configuration SGE configuration SDSC VM hosting server AFG VM replica 1 AFG VM Rocks VM Globus/SGE Autodock VM Opal server


Download ppt "Motivation 1.Application resources setup – make it easy 2.Transform PRAGMA grid – add on demand –Continue using Grid resources –Add cloud resources Current."

Similar presentations


Ads by Google