Presentation is loading. Please wait.

Presentation is loading. Please wait.

 ABSTRACT  COMPANY PROFILE  PROJECT PROFILE  INTRODUCTION  PROJECT MANAGEMENT  MODEL USED  SCHEDULING  RISK MANAGEMENT  SYSTEM REQUIREMENT SPECIFICATION.

Similar presentations


Presentation on theme: " ABSTRACT  COMPANY PROFILE  PROJECT PROFILE  INTRODUCTION  PROJECT MANAGEMENT  MODEL USED  SCHEDULING  RISK MANAGEMENT  SYSTEM REQUIREMENT SPECIFICATION."— Presentation transcript:

1

2  ABSTRACT  COMPANY PROFILE  PROJECT PROFILE  INTRODUCTION  PROJECT MANAGEMENT  MODEL USED  SCHEDULING  RISK MANAGEMENT  SYSTEM REQUIREMENT SPECIFICATION  USER CHARACTERISTICS  TOOLS AND TECHNIQUES  SYSTEM ANALYSIS  NEED FOR NEW SYSTEM  FUNCTIONAL SPECIFICATION  FEASIBILITY ANAYLSIS  DIAGRAMS  PROTOTYPE  CONCLUSIONS  REFERENCES INDEX

3  This image viewer application would read shape-files store it in the database in the required format, read the data stored in the database and convert it again to a shape-file.  After reading the database, generating the shape-file and displaying it the shape-file can be modified and again stored back to the database.  Modification includes creation layers like Raster layer and Vector layer, creation of lines,arcs,curves, polygons etc..on the vector layer. ABSTRACT

4  PROJECT SUMMARY  The definition of this project is “ Java Desktop Application to View Shape Files ”. As the name suggest, this provides interface to access the various functionalities for Analysis purpose in GIS application. Using this application the analyst gets a user interactive platform to carry out the analysis work easily and in less time. Here user can perform various process to analysis the map in the best and easy way. INTRODUCTION

5  PURPOSE  The existing Systems are created using licensed software so the cost of the system is very high.  Open Source system available doesn’t have required functionalities.  SCOPE  To develop features like open source, cost effective,platform independent and user friendly. INTRODUCTION

6  MODEL USED PROJECT MANAGEMENT

7

8

9  RISK IDENTIFICATION  Identifying the risk and taking the following measures.  RISK ANALYSIS  Analysing the risk,as what type of damage will it do to the system.  RISK PLANNING  Planning should be made for overcoming the risks RISK MANAGEMENT

10 SYSTEM REQUIREMENT SPECFICATION

11 There are mainly following types of users.  Civil engineers/ Geotechnical engineers The method can be used for site investigations for civil engineering.  Mining engineers To find out depth of ore body.  Geologist  In search for bearing structures.  Govt. officials  Different department of any Govt. can use the system to acquire the information of geophysical survey. USER CHARACTERISTICS

12  Hardware required :  PROCESSOR : Pentium 4 or above  RAM : Minimun Required 512 MB  HARDDISK : 80GB  Software Required :  OS: Windows XP or later  Front End : Java SE(jdk 1.6.0)  Back End : MS-Access / MySQL  Editor : NetBeansIDE (7.1.2)  Documentation Tools :  Microsoft Word TOOLS AND TECHNIQUE

13  STUDY OF CURRENT SYSTEM/PROBLEMS  Arc Gis Software  Heavy weight  More Complex (Editing becomes complex)  Requires expensive licensing  Not Open source  Not Platform Independent SYSTEM ANALYSIS

14  Cost savings resulting from greater efficiency  Open Source and Platform Independent  Simple GUI(Graphical User Interface) NEED FOR NEW SYSTEM

15  Login  Forgot password & Security question  Shape-file Viewer  Selecting a shape-file  Save it to the database  View the shape file using database  Creation of layers (Raster & Vector)  Modification of shape-files  Creation of shape (Vector)  Save it to the database FUNCTIONAL SPECIFICATION

16  Technical Feasibility :  The feasibility analysis reveals that the client would be able to use the application without any technical difficulty.  Schedule Feasibility :  According to the analysis and project planning the application would be implemented in stipulated time frame.  Economic Feasibility :  As it is an Open Source application, the cost of the project would be Economic for the user. FEASIBILITY ANALYSIS

17 USE-CASE

18 CONTEXT

19 DATA FLOW(1 st level)

20  2 nd Level DFD to View shape files DATA FLOW(2 nd level)

21  2 nd Level DFD for adding layers DATA FLOW(CONT.)

22  2 nd Level DFD for selecting layers DATA FLOW(CONT.)

23  2 nd level DFD for generating shape files DATA FLOW(CONT.)

24 STATE TRANSITION

25 CONTROL FLOW

26 PROTOTYPE

27 SHAPE FILE VIEWER

28 FILE MENU

29 OPEN SHAPE FILE

30 Displaying political.shp on GIS frame

31 Adding new shape layer

32

33  Adding road-line.shp Adding road-line.shp

34 Using zoom in

35 Using zoom out tool

36 Get selected features of selected layers

37  As it is an Open Source Application it would be utilized by the users with all functionalities which existing Open Source Applications are not providing.  It would be helpful to the users for Geo-Spatial Analysis. CONCLUSION


Download ppt " ABSTRACT  COMPANY PROFILE  PROJECT PROFILE  INTRODUCTION  PROJECT MANAGEMENT  MODEL USED  SCHEDULING  RISK MANAGEMENT  SYSTEM REQUIREMENT SPECIFICATION."

Similar presentations


Ads by Google