Susquehanna River Hydroelectric Projects 1 Shawn A. Seaman September 27, 2010 Image or Graphic.

Similar presentations


Presentation on theme: "Susquehanna River Hydroelectric Projects 1 Shawn A. Seaman September 27, 2010 Image or Graphic."— Presentation transcript:

1 Susquehanna River Hydroelectric Projects 1 Shawn A. Seaman September 27, 2010 Image or Graphic

2 Susquehanna River Hydroelectric Projects 2 Five Major Hydroelectric Facilities on the Lower Susquehanna River: York Haven (Olympus Power) – FERC License Exp. 2014 Safe Harbor (PPL/Constellation) – FERC License Exp. 2030 Holtwood (PPL) – FERC License amended to 2030 Muddy Run Pump/Storage (Exelon) – FERC License Exp. 2014 Conowingo (Exelon) - FERC License Exp. 2014

3 Susquehanna River Hydroelectric Projects 3

4 4

5 5 Consequences of Dams Blocked migration of American shad, River Herring, Sturgeon, American Eel, etc. Project operations affect habitat within the watershed

6 Susquehanna River Hydroelectric Projects 6 History of Upstream Passage 1972- Conowingo West Fish Lift 1991- Conowingo East Fish Lift 1997- Fish Lifts at Holtwood and Safe Harbor 2000- Vertical-slot ladder in operation at York Haven

7 Susquehanna River Hydroelectric Projects 7

8 8 FERC Relicensing Holtwood received license amendment, to make major modifications, increase generation and improve fish passage York Haven, Muddy Run, and Conowingo started re-licensing in 2009 (2014)

9 Susquehanna River Hydroelectric Projects 9 Study Requests Cooperative effort of: –Maryland DNR, –Pennsylvania Fish and Boat Commission, –Pennsylvania DEP –Susquehanna River Basin Commission –US Fish & Wildlife Service Concerns –Environmental, –Fisheries / biological, and –Recreation

10 Susquehanna River Hydroelectric Projects 10 Conowingo/Muddy Run Studies 32 Pre-licensing studies: Ongoing (2010-2011) –Fish passage (including eels): efficiency & capacity –Flow management: minimum flows & pond levels –Recreation and land management –Water quality: D.O. / sediments / nutrients –Biological surveys: mussels, sturgeon, eagles, etc.

11 Susquehanna River Hydroelectric Projects 11 The Challenge? To gather all necessary data / information during the study period in order to develop well-informed, adaptive, licensing conditions This process will ultimately establish the fate of Susquehanna River fish stocks at least through the year 2044!! (Maybe 2064??)