Download presentation
Presentation is loading. Please wait.
1
DCIM212
2
theUberGeekGirl.com @ubergeekgirl Facebook.com/WestITpros
9
9
10
Credit: Gene Kim
28
Technology Culture
29
Credit: Jez Humble @jezhumble
40
Kanban – A focus on Visibility and Constraints One kanban card attached to one piece of work. Each card acts as a signaling mechanism Cards are pulled when there is capacity to handle the card No free cards means no work can be started. A pull system cannot be overloaded if the capacity (determined by number of signal cards) has been set appropriately.
41
ValidateDesignDeliverDone Implement doing Maint Projects Implement done 96 Where is work stuck?
51
Challenges of devops
57
Subscribe to our fortnightly newsletter http://aka.ms/technetnz http://aka.ms/msdnnz Free Virtual Hands-on Labs http://aka.ms/ch9nz Free Online Learning http://aka.ms/mva http://aka.ms/technetlabs Sessions on Demand
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.