Download presentation
Presentation is loading. Please wait.
Published byLillian Foster Modified over 9 years ago
3
SENIOR DESIGN PROJECT by Tal Wigdor Standard Setup Procedures for OKUMA CNC Lathe Machine at BFGoodrich, Inc.
4
Table of Contents Project Objective Problem Description Development of Setup Standard Setup & Setup Time Table Recommendation
5
Project Objective Develop standard setup procedures for an OKUMA CNC.
6
No standardized setup time Variability between setup times Different methods of setup Experienced operator Problem Description
7
Development of Setup Understand the procedures of the machine shop Collect data Create step by step procedures Standardize the setup process Document the setup process Time measurement
8
Standard Setup & Setup Time Table Obtain proper parts to be machined Install the segments Inspect and reset zero Time Table
9
Recommendations Appropriate training Safety seminar Safety precautions Reduce setup time Implicate setup procedures Reduce amount of separate setups
10
Finally Any Questions ?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.