Genzyme Center: Brownfield Development and Green Building Construction

Similar presentations


Presentation on theme: "Genzyme Center: Brownfield Development and Green Building Construction"— Presentation transcript:

1 Genzyme Center: Brownfield Development and Green Building Construction
Rick Mattila – Genzyme Corporation Stuart Dash – Genzyme Corporation Ed Walsh – Mira Development Tom Clark – The RETEC Group, Inc. Chuck Wilk – Portland Cement Association

2 Presentation Overview
Rick Mattila Welcome and Overview of Project and Building Stuart Dash Land Use Plans Ed Walsh Redevelopment Tom Clark and Chuck Wilk Remediation Genzyme Center Wrap Up and Thank You

3 Land Use Plans Stuart Dash Director of Community Planning
City of Cambridge Community Development

4 Historical Land Use Tidal Marsh Charles River Basin Industrial Era

5 NASA CRA/Kennedy DOT/Kendall Square

6 East Cambridge Riverfront
Establish PUD Process Design Guidelines

7 The ‘80s Office Park Proposal Zoning Committee

8 Proposal by Lyme & the East Cambridge Response
Open Space Rezoning

9 The Project at the Planning Board
The PUD Process Traffic Decision

10 The Project Underway The Buildings The Open Space The Impact

11 Ed Walsh President Mira Development (Formerly of Lyme Properties)
Redevelopment Ed Walsh President Mira Development (Formerly of Lyme Properties)

12 Kendall Square Introduction
Former Use: Manufactured Gas Plant (MGP) Primary Contamination: DNAPL Environmental Remediation: March October 2001 New Use: Life Science/Office, Residential, Performing Arts, Retail, Restaurant, and Public Open Space Development Schedule:

13 Kendall Square Site Size: 10 Acres Location: Cambridge, Massachusetts
Bounded by Linskey Way, Third Street and Broad Canal Topography: Flat Surrounding Community: Densely Populated with Commercial, Residential and R&D Users

14 Kendall Square Historic Use (1870-1998)
Prior to 1870: Open Space & Marsh Land : Cambridge Gas Light Company (Manufactured Gas Plant) : Old Colony Tar Company (tar rendering operation) : COM Electric & Gas (Surface Parking Lots – Temporary Remedial Solution as Interim Cap) K

15 Kendall Square Contamination from Historic Activities
Coal Tar Residuals: Polycyclic Aromatic Hydrocarbons in soils (0-20 feet below grade) and as Dense Non-Aqueous Phase Liquid > 0.5” in depth at groundwater/clay interface (approximately 20 feet below grade) Petroleum Residuals: Volatile Organic Compounds in soils (0-20 feet below grade) and as Light Non-Aqueous Phase Liquid (LNAPL) >0.5” in depth on surface of groundwater (approximately 10 feet below grade) Groundwater Quality: Generally meets GW-2 Standards (non-potable but typical of urban setting)

16 Kendall Square Master Plan
Building A: 247,000 SF lab (Vertex) Building B: 223,000 SF lab (TBD) Building C: 85,000 SF Performing Arts (Constellation) Building D: 273,000 SF Office (Genzyme) Building E1: 150,000 SF Residential (TBD) Building E2: 330,000 SF Residential (Twining) Building G: 50,000 SF Mixed Use (res./retail/office) Parking: Two Below Grade Facilities for 2,000 Vehicles (beneath Building B and Buildings E1/E2/G)

17 Kendall Square Master Plan Drivers
Maximize Density: FAR of Bonus Housing for total of 1,376,000 SF of Mixed Use Development Optimize Return on Investment Below Grade Parking: 2,000 Vehicles Aesthetics & Integrated Design: Contemporary, Class “A” Architecture Complementary Open Space with Public Amenities

18 Kendall Square Summary of Remedial Program
Remedial Drivers Permanent Solution Neighborhood Impacts Cost & Schedule Compatibility Ability to Obtain Financing Environmental Liability Insurance Kemper & Zurich (1st & 3rd Party Coverage w/ Re-opener) $20 MM/10 Year Term Phase I Remediation $11 MM Soil Premium RAO Filed 2002 No AUL Phase II Remediation $8 Million for In Situ Stabilization Three pRAOs filed in 2002 Three AULs filed in 2002 Two pRAOs filed in 2004 One AUL filed in 2004 $6.5 Million Premium for Soil Disposal on Building B Garage

19 Kendall Square Development Summary
Land Acquisition: $21,000,000 or ~ $15/FAR SF Remediation Costs (hard & soft cost): $25,000,000 or ~$18/FAR SF Site Development/Infrastructure/Open Space Areas (soft & hard costs): $20,000,000 or ~$15/FAR SF Total Pre-Construction (garage & infrastructure) Costs: $70,000,000 or ~$50/FAR SF Comparable Value – Clean Site w/ Permits & Infrastructure: ~$65/FAR SF Permitting and Environmental Risk: $15/FAR SF

20 500 Kendall Street, Cambridge, Massachusetts

21 675 West Kendall Street, Cambridge, Massachusetts

22 350 Third Street, Cambridge, Massachusetts

23 Remediation Tom Clark and Chuck Wilk Title ??? The RETEC Group, Inc.
Portland Cement Association

24 Kendall Square Remediation

25 Kendall Square Presentation Outline
History Environmental Conditions Remediation Strategy Remediation Details

26 Kendall Square Historic Use (1870-1960)
Prior to Open Space & Marsh Land K

27 Manufactured Gas Plant
Kendall Square Historic Use ( ) Manufactured Gas Plant K

28 Kendall Square Historic Use (1870-1960)
Historic MGP Structures K

29 Kendall Square Contamination from Historic Activities
1,000 tons of Coal yields 10,000 MCF Gas and 12,500 Gallons of Tar

30 Kendall Square Contamination from Historic Activities
Bell Ground Surface Below Grade Masonry Water Tank Diagrammatic Section of Multiple Lift Gas Holder

31 Kendall Square Contamination from Historic Activities

32 Kendall Square Remediation Strategy in Support of Redevelopment

33 Kendall Square Remediation Strategy in Support of Redevelopment
Management of Uncertainty Extensive investigation and precharacterization Environmental Insurance - $10 MM, 10 year-term Selection of Remedial Technologies Extensive cost/benefit evaluation Locate garage excavations in areas with the cleanest soils to reduce the cost of soil disposal Remediate the most contaminated areas using ISS to allow soils to stay on site Engineering and Institutional Controls to Manage Risks Associated with Contamination Remaining On Site Engineering Controls - vapor barriers, venting systems, and dewatering and water treatment systems Institutional Controls - Activity and Use Limitations (AULs)

34 Kendall Square Excavation Summary
Location of two 4-Level Garages with 2,000 car capacity In Situ Sampling: >800 Samples Clean Up Goal: Clean Closure Mass Excavation with Off-Site Disposal & Recycling Duration: March, October 2001

35 Kendall Square Excavation
Precharacterization Grid – 1 of 7

36 Kendall Square Remediation Excavation

37 Kendall Square Remediation Excavation

38 Kendall Square Remediation In Situ Solidification (ISS)
In Situ Solidification Area

39 Kendall Square Remediation In Situ Solidification (ISS) Summary
Clean Up Goals Address NAPL Risk Based Closure Impact Area: 3.3 acres to 20 feet deep (~100,000 CY) Removal of all Subsurface Obstructions to 15 feet bgs In Situ Solidification with Cement Slurry Duration: June April 2001

40 Kendall Square Remediation In Situ Solidification (ISS)
Conceptual In Situ Solidification Operation

41 Kendall Square Remediation In Situ Solidification (ISS)

42 Kendall Square Remediation In Situ Solidification (ISS)

43 Kendall Square Remediation In Situ Solidification (ISS)
ISS Design Mixture 7% Cement by Weight 5% Water by Weight <1% Bentonite by Weight Performance verified in laboratory treatability study Performance verified with quality assurance testing during construction

44 Kendall Square Remediation In Situ Solidification (ISS)

45 Kendall Square Remediation Odor and Vapor Management
Suppressant Foam Weather Impacts Wind Screens Air Monitoring Odor Monitoring Reporting Stockpile Management Sequencing Public Meetings

46 Kendall Square Activity & Use Limitations in ISS Area
Risk Based Approach Recorded with Deed Major Limitations Engineering Controls Vapor Barrier/ Sub-Slab Venting System with Vapor treatment Soil Management Plan Pavement or Clean Soil Cover in Open Space Areas

47 Kendall Square Engineering Controls


Download ppt "Genzyme Center: Brownfield Development and Green Building Construction"