Download presentation
Presentation is loading. Please wait.
Published byRodger Alan Underwood Modified over 9 years ago
1
COSCAP- North Asia Briefing to the NARAST Meeting 14 April 2004 COSCAP North Asia Cooperative Development of Operational Safety & Continuing Airworthiness Programme
2
Introduction é ICAO Chief Technical Advisor (CTA) Captain Len Cormier é Previous five years engaged as ICAO CTA COSCAP - South Asia é Previous to that Transport Canada (CAA) Inspector and Manager – 20 years – Licensing, Aerodromes, Flight Operations Standards
3
Introduction é Admin - Ms. Sun Qun 86 10 84024554 é Flight Operations – Capt. Lin Bo é Airworthiness – Mr. Nie Junjian é ICAO Airworthiness Expert – January 2004 é Aerodrome Certification Expert – 4 months é Air Traffic Management Expert – 6 weeks
4
Background é COSCAP – North Asia é Cooperative Development of Operational Safety and Continuing Airworthiness Programme (Annex 1, 6, 8,11,14) é Other COSCAPs é South Asia – 7 States Commenced 1998 é South East Asia – 12 States/Administrations Commenced Operation 2001 é Africa Region, other regions
5
Background é Objectives é Forum for promoting dialogue, coordination and cooperation concerning flight safety matters between CAAs é Harmonization and Advancement of Safety Oversight policies, procedures and regulations é Efficient and cost-effective method for the conduct of inspection and certification
6
Background é Objectives é Assist with training of aviation and airline personnel é Promote accident prevention through the establishment of North Asia Regional Aviation Safety Team (NARAST) as proposed by the ICAO Global Aviation Safety Plan (GASP) é Assistance with USOAP preparation and action plan implementation
7
Background é Co-operative Agreement Between States of China, DPRK, Mongolia, ROK, (Japan has been invited to join the COSCAP-NA) é COSCAP-NA Headquarters at CAAC HQ, Beijing (Rm 604, 615) é COSCAP-NA Steering Committee meets every 6-8 months to assign the tasking and priorities and ICAO is the executing agency
8
Background é Programme funded by States and donor agencies é Commenced operations with arrival of CTA in February 2003 é 1 st COSCAP-NA Steering Committee meeting conducted 8-9 April 2003 é 2 nd Meeting November 2003
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.