Download presentation
Presentation is loading. Please wait.
Published byMartina Parrish Modified over 9 years ago
3
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE
4
NextPrevious Alma Pierce Elementary School LAREDO INDEPENDENT SCHOOL DISTRICT PROJECT OVERVIEW FLOOR PLAN SEGMENT C SURVEY EXTERIOR ELEVATIONS SITE PLAN BUILDING SECTIONS FLOOR PLAN FLOOR PLAN SEGMENT A FLOOR PLAN SEGMENT B OPINION OF PROBABLE COST
5
NextPrevious PROJECT OVERVIEW Capacity: Project Size: Existing E.C.C.: New Construction: Budget: 870 Students (Pre K5th Grade) 86,647 sq.ft. 13,470 sq.ft. 73,177 sq.ft. $ 5.3m PROJECT OVERVIEW. $ 5.3m Alma Pierce Elementary School
6
NextPreviousSURVEY Alma Pierce Elementary School
7
NextPrevious SITE PLAN SITE PLAN Alma Pierce Elementary School ADMINISTRATION KITCHEN CAFETERIA CLASSROOMS GYMNASIUM LIBRARY MECHANICAL RESTROOMS STORAGE COMPUTER LABS MUSIC NURSE SPECIAL EDUCATION CIRCULATION LEGEND
8
NextPrevious FLOOR PLAN ADMINISTRATION KITCHEN CAFETERIA CLASSROOMS GYMNASIUM LIBRARY MECHANICAL RESTROOMS STORAGE COMPUTER LABS MUSIC NURSE SPECIAL EDUCATION CIRCULATION LEGEND Alma Pierce Elementary School
9
NextPrevious FLOOR PLAN SEGMENT A Alma Pierce Elementary School CAFETORIUM DRY STOR. COOLER OFFICE RECEIVING OFFICE MUSIC GYM STOR. STOR SECRETARY SELF CONTAINED JANITOR’S LAUNDRY RM TEACHER’S LOUNGE CONFERENCE TOILET ROOM MECHANICAL VICE-PRINCIPAL STOR. FREEZER FOOD PREP GYMNASIUM SPECIALIST CURRICULUM RECEPTIONIST ART ROOM COUNCILOR STORAGE ROOM LAB SCIENCE CLINIC STO. FILE ROOM PRINCIPAL TEACHER’S WK RM
10
NextPrevious FLOOR PLAN SEGMENT B Alma Pierce Elementary School COMPUTER LAB MECH/ DATA ROOM MEDIA CENTER A / V STORAGE DATA COMMUNICATION CLASSROOM WORK ROOM /MULTI PURPOSE CLASS ROOM COMPUTER LAB TOILET ROOM CLASS ROOM OFFICE TEACHER’S STO. OFFICE WORK ROOM RECEPTION AREA BOOK ROOM
11
NextPrevious FLOOR PLAN SEGMENT C Alma Pierce Elementary School CLASS ROOM BOY’S TOILET RM GIRL’S TOILET RM CLASS ROOM
12
NextPrevious EXTERIOR ELEVATIONS Alma Pierce Elementary School West Elevation East Elevation Entry Elevation North Elevation
13
NextPrevious BUILDING SECTIONS Alma Pierce Elementary School Building Section C Building Section A Building Section B
14
NextPrevious Alma Pierce Elementary School OPINION OF PROBABLE COST General Conditions Site Work Concrete Masonry Metals Wood & Plastics Thermal & Moisture Doors & Windows Division 9 Division 10 Division 11 Division 12 Division 13 Division 16 Division 15 Division 14 $ 422,750 $ 282,500 $ 478,000 $ 698,500 $ 702,500 $ 130,250 $ 52,500 $ 140,250 $ 450,500 $ 32,750 $ 36,500 $ 18,750 $ 0.00 $ 925,500 $ 872,750 $ 0.00 CONSTRUCTION BUDGET. $ 5,300,000 Division 1 Division 2 Division 3 Division 4 Division 5 Division 6 Division 7 Division 8 Finishes Specialties Equipment Furnishings Special Construction Electrical Mechanical Conveying Systems $ 5,244,000* * Opinion of probable cost does not include soft cost, project contingency, ff. & e.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.