From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH Justin Yoh, The Ohio Department of Transportation - District 7 Mark Nolt, The Kleingers Group, West Chester, OH
2
Application and Selection
3
The School Travel Plan Funding Eligibility Pre-application Considerations Non-infrastructure Infrastructure Alternative Funding Sources District SRTS Coordinator Involvement The SRTS Funding Application Overview of the 2015 Funding Application Project Selection Process Project Review Notification & Next Steps The Steps
4
Funding Eligibility An ODOT approved School Travel Plan (STP) Infrastructure Non-infrastructure Any updates to your STP are required to be submitted to ODOT as part of the funding application packet. The School Travel Plan and Your SRTS Team The School Travel Plan
5
Funding Eligibility Your STP Action Plan should be reviewed and updated annually. Evaluate the priority level of each of the action items (i.e. short term or long term). Only items listed in your action plan are eligible for funding. An updated action plan is required to be submitted to ODOT as part of the funding application packet. Action Plans And Action Items
6
Funding Limit: $50,000 Identify projects that provide high benefit at lower costs. Printed materials Incentives Safety Programs Limited Enforcement Campaigns Reach out to other communities, local MPO’s and advocacy groups for their input. Pre-application Considerations Non-Infrastructure Projects
7
Kate Moening State Advocacy Organizer – Ohio (614) 269-7085 kate@saferoutespartnership.org SRTS National Partnership
8
Funding Funding Limit: $500,000 This funding cap applies to total project cost (Design to Construction). PDP Phases Eligible for Funding Design (approx. 20% of Construction) Environmental Detailed Design Right-of-Way (approx. $4,500 per parcel) Acquisition Appraisal Utility Relocation Construction Construction Engineering (approx. 10% of Construction) There is a 20% local match required however, toll revenue credit can be requested to cover the 20% local match. Pre-application Considerations Infrastructure Projects
9
Sidewalk/Shared Use Paths/Curb Ramps Pros: Provides needed connectivity Non-infrastructure programs see increased participation Provides separation of pedestrians and motorists ADA compliance Cons: Higher construction costs Greater likelihood of right-of- way needed Alternative funding sources needed to fund larger sidewalk projects Pre-application Considerations Infrastructure Projects
10
Signing & Pavement Markings Pros: Implemented systematically and at a lower cost Designates school zones and crossings Cons: Requires existing infrastructure Requires additional annual maintenance Pre-application Considerations Infrastructure Projects
11
Traffic and Pedestrian Signals Pros: Provides a more safe means of crossing at intersections and/or mid-block Cons: Higher construction costs Higher likelihood of right-of-way needed Must meet signal warrants to be eligible for funding Pre-application Considerations Infrastructure Projects
12
Transportation Alternatives Program (TAP)* Ohio Public Works Commission (OPWC) Congestion Mitigation and Air Quality Improvement Program (CMAQ)* Safety Program Small Cities Grants * Dispersed through Ohio’s metropolitan planning organizations Pre-application Considerations Alternate Funding Sources
13
Involve your District SRTS Coordinator early! Pre-application Considerations District SRTS Coordinator
14
Improving your Application’s Overall Electronic Score Recent non-infrastructure projects Shows an overall commitment to the program International Walk/Bike to School Day Register your International Walk/Bike to School Day at www.walkbiketoschool.org. www.walkbiketoschool.org Expected Benefit Focus your projects in areas with a high density of students or in areas around the school campus. Funding Application Overview
15
Improving your Application’s Overall Electronic Score Project Funding Provide at least 10% of the local match Utilize alternative funding sources to increase your local match Federal funds from other funding sources CANNOT be used as your local match Speed Limit Focusing your projects in areas where higher traffic speeds are present Funding Application Overview
16
Improving your Application’s Overall Electronic Score Crash History Focus your projects in areas where bike/pedestrian crashes can be mitigated Right-of-Way Permanent and temporary right-of-way takes result in negative points. Funding Application Overview
17
Project Description Project Mapping Include mapping showing your proposed improvement along with the written description. Written Description Be detailed in your response Include as an attachment if necessary ODOT SRTS coordinators will be presenting your project for funding consideration! Funding Application Overview
18
Electronic Scoring All applications receive a preliminary score based on the responses in the application. Applications are ranked by this score A cut-off line is established based upon: Available funding Strength of eligible applications received Applications above the cut-off line are further reviewed at the district level. Project Reviews
19
District Level Review The overall delivery and constructability of the proposed project is reviewed: Project Schedule (requested construction year) Project Estimate (funding per PDP phase) Connectivity (for sidewalk/path projects) Red Flags (R/W, Environmental, Utilities) Priority in the Action Plan Recommended projects are then reviewed by a multi- disciplinary team at Central Office ODOT. Project Reviews
20
Multi-Disciplinary Review Team District SRTS Coordinators Statewide SRTS Program Manager Department of Education Representatives Department of Public Safety Representatives Department of Health and/or County Health Department Representatives ODOT Safety Program Representatives Bike/Ped/SRTS Advocacy Group Representatives The review team will provide the Governance Board with a short-list of projects (school travel plan, non- infrastructure and infrastructure). Project Reviews
21
Governance Board Makes the final selection as to which projects are awarded funds. Total available funding for the upcoming funding cycle is $4 million. Applicants are notified of the funding results in May/June at which time the scoping and programming process begins. Notification and Next Steps
22
November – December 2014 Begin coordinating your proposed projects with district coordinators January – March 2015 Funding round open to accept applications School Travel Plan Development Non-infrastructure Infrastructure March – April 2015 Application Review Process May – June 2015 Award Notifications and Scoping Process Begins Key Dates