Joe Mercer Operations Planning Engineer III Operation Planning Analysis PHAAUG Meeting Mar 12 th, 2015
2
2 Peak OPA Tasks and Estimated Timeframes (red) Select RTNET Base Case 8:00A Review and Apply Innages/Outages 8:15A Review and Apply Load/Interchange Forecast 11:00A Review and Apply Path SOLs 1:00P Run STCA 1:00P Validate STCA Results 1:00-2:00P o Check for any posted entity study reports Entity Results Coordination 2:00-5:00P Compile OPA and present to RCSOs 5:00-6:00P Peak OPA Overview
3
3 RTNET Basecase and OPA Study Date YesterdayToday Tomorrow State Estimator (RTNET) snapshot WECC peak load Projected WECC peak load …snapshot case updated with forecasted data …
4
4 Using PI, determine appropriate timeframe Select RTNET Base Case
5
5
6
6 Select closest RTNET snapshot Select RTNET Base Case
7
7 Base case topology Generation, load, and interchange profile Path SOL Bulk electric system SOL Contingency and RAS database RAS arming points RTNET Base Case Initial Conditions
8
8 Update OPA With Forecasted Data YesterdayToday Tomorrow RTNET BasecaseOPA Study …Forecasted topology, load, interchange, and path SOL…
9
9 “Innages” – All elements that need to be returned to service. Outages – All elements that need to be removed from service. o COS Equipment Mapping database available on peakrc.org. Apply Innages/Outages
10
10 Customized COS Data view Date Filtered and Exported to Excel Apply Innages/Outages
11
11 Outage Data Filtered to determine outages and innages. Text file export containing outage/innage data. Apply Innages/Outages
12
12 Script driven application of outages. Process to verify COS mapping exists for outage description. Process to verify mapped topology changes were performed. COS Outages Auto-Application
13
13 Phantom scheduled outages. “One at a time” outages. “Operation Restricted” outages. “Hot work hold” outages. Line section outages. Outages elements not in COS Common COS Pit-Falls
14
14 Ideal: Forecasted Load + Forecasted Generation = Forecasted Interchange Currently: Forecasted Load + Basecase Initial Conditions Generation = Basecase Initial Conditions Interchange Load, Generation, Interchange Forecast
15
15 Apply Load Forecast
16
16 Apply Load Forecast
17
17 Apply Interchange Forecast
18
18 Day ahead unit commitment data not accurate enough to use for OPA. Unit “innage” does not indicate unit output. Unit derate does not indicate unit output. Generation Forecast Shortcomings
19
19 Apply New/Retired Path SOLs Path Report Data from COS
20
20 Before Running STCA: Review basecase SOL exceedances Review basecase path SOL exceedances Run STCA
21
21 STCA Results
22
22 Verify historical RC notes, limits, and contingency definition. Verify outage taken and/or scheduled accurately. Determine load/interchange impact on SOL exceedance. Review entities posted reports. Verify RAS or other protection schemes. Validate STCA Results
23
23 Typically occurs mid-late afternoon Validate results o Entities posted results, Ratings, Prior RC notes, RAS status, etc. Peak usually emails or calls the entities o After hours follow up with Peak RC ROE, if needed. Validate coordinated mitigation plans Entity Results Coordination
24
24 Compile OPA and present to RCSOs Using SharePoint, log highlights of the OPA. Post OPA report internally and externally. Brief the RC leads the OPA results.
25
25 Contingency Definition Creating Contingency Definitions RAS Summary and Editor Peak RAS Project Contingencies and RAS
26
26 Contingency Definitions
27
27 Contingency Definitions
28
28 Creating Contingency Definitions
29
29 Creating Contingency Definitions
30
30 Creating Contingency Definitions
31
31 RAS Summary
32
32 RAS Summary
33
33 RAS Editor
34
34 RAS in EMS (RTCA) Viewing the triggers
35
35 RAS in EMS (RTCA) Viewing the actions
36
36 Viewing the results o EMS Displays Level 3 24 pt RAS in EMS (RTCA)
37
37 Specific results o EMS Displays Level 3 24 pt RAS in EMS (RTCA)
38
38 Peak RAS Project 1 year ago 8% complete Now 96% 8169 ctgs, 736 ctgs enabled for RAS
39