Download presentation
Presentation is loading. Please wait.
Published byEric McGee Modified over 9 years ago
1
FIDEL meeting 22/02/07 - Stephane Sanfilippo AT-MTM Status of data retrieval (SSS and S4 tested in SM18). Data retrieval : goals, agenda. Procedure of data treatment and validation Status of the data treatment (20/02/07).
2
FIDEL meeting 22/02/07 - Stephane Sanfilippo AT-MTM Number of quadrupoles to be treated. MQ: 28 MQ (transfer function, multipoles). MQM : 4 MQM (transfer function, multipoles) The other MQM were measured in Block 4 and treated by W.Venturini. MQY : 12 MQY (transfer function, multipoles) MQY measured in Block 4 will be treated by W.Venturini. MQTL (Q6): 1 measured completely in SM18. 45 magnets to be treated in total.
3
FIDEL meeting 22/02/07 - Stephane Sanfilippo AT-MTM What we will get after the retrieval. 4 reference tables corrected and entered in the SMA web site. Transfer function: TF for currents between injection and nominal in ramp up and ramp down (systematic correction with SSW measurements) Integrated harmonics: Integrated strength and multipoles between injection and nominal in ramp up and ramp down. Integrated components: Geometric, saturation, magnetization, hysteresis, decay (when it is measured). Variation of the b 2 and multipoles with time during the reference machine cycle (format table integral_harmonic) Agenda For MQ in arc SSS : ready end of February. For MQY and MQM : ready end of March.
4
FIDEL meeting 22/02/07 - Stephane Sanfilippo AT-MTM Cleaning procedure. Re-analysis of the raw data coming from machine cycle and load-line. Transfer function Check/correct the offset based on SSW measurements Correct jumps in transfer function along the loadline in particular around 2000-3000 A Add the ramp down YF=f(I). Angles Introduction of the Mag_fid angle measured with the SSW (table provided by Marco Buzio) Harmonics Add the multipoles as a function of the current (ramp up and down) Multipoles components Check of the components Ramp rate effect added when measured Decay file prepared (variation of the b 2 and multipoles with the current for the reference cycle). Final checks Creation of a log file including offsets, angles, comments.
5
FIDEL meeting 22/02/07 - Stephane Sanfilippo AT-MTM Transfer function correction :extreme case. Raw data Strength correction based on SSW cross-check + jump at low current corrected. Correction confirmed by another measurement with re-calibrated amplifiers Criteria : Correction performed when the jump is higher than 1 unit.
6
FIDEL meeting 22/02/07 - Stephane Sanfilippo AT-MTM Status of the MQ, MQM, MQY treatment. MQ: 16 treated/ 28 the 20/02/07. No MQM and MQY for the moment. Second run of checking is needed at the end.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.