1
23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 Status of the ESA Earth Observation Programmes Dr. Simonetta Cheli Head of Earth Observation Coordination Office ESA/ESRIN November 2009
2
23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 EO missions and exploitation Envisat 8 th year in operation, ERS-2 14 years in space About 2600 scientific users / projects are served with Envisat and ERS-2 data 30 Third Party Missions for the benefit of European users
3
23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 Envisat Extension Envisat mission extension approved by ESA Member States in May Envisat orbit to be changed in October 2010 Thereafter, all applications remain possible with exception of SAR interferometry Hurrican Jimena, 31 August 2009 Ozone layer evolution 1995-2009
4
23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 ERS-2 / Envisat Tandem campaign 2008/2009 to measure the velocity of arctic fast moving glaciers around 200m/year to generate accurate low relief digital elevation models - of particular interest for many low elevation delta regions (e.g. New Orleans, Po-Delta with Venice, The Netherlands, Bangladesh, Mekong Delta, Netherlands, northern Siberia, etc) to improve the general understanding of interferometry and coherence to rise interest in mapping fast land surface movements ERS-2 and Envisat
5
23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 GOCE 17 March ADMAEOLUS EARTH CARE SWARM 7 th EE SMOS 2 November Cryosat 28 Feb. 2010 ESA Earth Explorers
6
23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 GOCE (Gravity field and steady state Ocean Circulation Explorer)) First ESA Earth Explorer dedicated to the exploration of the Earth gravity field Several satellite technology world premiers: most sensitive gradiometer ever flown, first drag-free flight with Ion thrusters, extremely low orbit Launched 17 March 2009. ESA ’ s Gravity Mission
7
23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 GOCE mission status ). Systems and instruments nominal GOCE continues to decay to operational orbit which was reached on 15 September Air drag still very low – stabilisation of orbit at 255km Measurement phase from 2 nd half of September until March 2010 ESA ’ s Gravity Mission
8
23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 2 launches within the next 6 months Earth Explorers 2 and 3
9
23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 All ITTs for the three selected candidate missions for the 7 th Earth Explorer have been issued in July Most of the six kick-off's are expected still within 2009. The first round of meetings of each MAG has taken place to consolidate the Phase A Mission Requirements Document Earth Explorer Seven
10
23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 The 2010 European Space Agency Living Planet Symposium will be held in Bergen, Norway from 28 June to 2 July 2010 and organised with the support of the Norwegian Space Center Objectives: a forum for investigators to present results of on-going research activities using ENVISAT, ERS, GOCE, SMOS, CRYOSAT and ESA Third Party missions data presenting the development of applications and services including GMES presenting the ESA Climate Change Initiative. Living Planet Symposium
11
23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 MTG status The first two major milestones of completing the Phase A Extension activities and releasing the B2,C/D ITT has been completed in July, on schedule. The next key date is the receipt of industrial offers on 2 nd October and conclusion of contractor selection by the end of this year. Meteosat Third Generation
12
23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 Activities on the Sentinel-1, -2 and -3 missions is progressing well The launch schedules have been redefined: S-1 May 2012, S-2 May 2013, S-3 April 2013 A draft Data Policy for the Sentinel missions has been approved by ESA Member States in September Negotiations with GMES Contributing Missions are progressing GSC The GMES Space Component Programme
13
23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 to systematically generate and distribute long-term series of “Essential Climate Variables” (ECV) to meet needs of UNFCCC and IPCC, based on ESA archived EO data The rationale of the initiative : The procurement plan for the Phase 1 of the Earthwatch CCI element has been approved by IPC end of September Programmatic activities are proceeding well. ESA Initiative on Climate Change
14
23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 Launch schedule of ESA EO missions