Presentation is loading. Please wait.

Presentation is loading. Please wait.

RADWG 2 ND - 2012 6 TH MARCH 2012 G. Spiezia (EN/STI/ECE)

Similar presentations


Presentation on theme: "RADWG 2 ND - 2012 6 TH MARCH 2012 G. Spiezia (EN/STI/ECE)"— Presentation transcript:

1 RADWG 2 ND - 2012 6 TH MARCH 2012 G. Spiezia (EN/STI/ECE)

2 AGENDA  Matters arising  Radiation test plan  PSI  CNRAD  H4IRRAD  Equipment in TT83 MWPC  BE-RF equipment in PS

3 Matters arising-1  LHC restart – 14 March 2012  The shift for the failure analysis will restart  Each group should communicate the failures which are related to radiations  A dedicated mail address will be created  Review of critical projects  Recommended by the R2E reviewers in Nov 2011  External experts and PH-ESE group can be contacted

4 Matters arising -2  Data base for tracking radiation tolerant components  Strong interest from TE/EPC  Very useful for all the groups that have equipment exposed to radiation  Definition of the specifications to complete  Collaboration with BE/CO for the implementation  NanoFip tested at PSI in December 2011  Test results will be presented by E. Gousiou at the next meeting  Should we proceed with a unique purchase for all the CERN groups?

5 PSI test plan -1 Date Equipment Owner Test groupDUT 1 FebruaryEN/STI PXI power supply 18-19February EN/STI Voltage regulator Cypress Toshiba Diff Amp TE/EPC AC/DC 17-18 MarchBI BPM electronics 24-25 MarchEN/STI Analog switches current regulator RadFet 21-22 April TE/EPCEN/STIMosfet-1 EN/STI RadMon prototype BI Beam Loss Monitor

6 PSI test plan -2 Date Equipment Owner Test groupDUT MayTE/EPCEN/STI Mosfet-2 or other, to be defined June-July TE/EPC EN/STI- TE/EPC PWM EN/STI Profibus for LVDT Conditioner AugustTE/EPC FGC critical components October EN/STI LVDT conditioner TE/EPCEN/STIDiode-1 DecemberTE/EPCEN/STI Diode-2 ADC-8bit TBD

7 PSI test plan -3  Program could be changed if high priorities arise  To be planned in time – 2 months before the slot  Other requests could arrive from TE/EPC for the FGC-Lite project.

8 CEA – 1 MeV facility  We can reserve beam time  Send requests if interested

9 Radiation test reports  From the radwg website radwg.web.cern.ch radwg.web.cern.ch  http://radwg.web.cern.ch/RadWG/Pa ges/reports/Radiation_report_menu.h tm http://radwg.web.cern.ch/RadWG/Pa ges/reports/Radiation_report_menu.h tm  EDMS link  https://edms.cern.ch/nav/P:CERN- 0000083951:V0/P:CERN- 0000091191:V0/TAB3Agenda https://edms.cern.ch/nav/P:CERN- 0000083951:V0/P:CERN- 0000091191:V0/TAB3Agenda

10 Course conference workshop  Course radiation effects R. Gaillard on CERN training web site  SEE symposium  April 2012  http://radhome.gsfc.nasa.gov/radhome/SEE/ http://radhome.gsfc.nasa.gov/radhome/SEE/  NSREC  July 2012  www.nsrec.net www.nsrec.net  RADECS  September 2012  www.radecs.com www.radecs.com

11 Back-up


Download ppt "RADWG 2 ND - 2012 6 TH MARCH 2012 G. Spiezia (EN/STI/ECE)"

Similar presentations


Ads by Google