Stave Vessel Design & Construction
Tom Kenyon May 2012
2
The Art of Segmented Wood Turning By Malcolm Tibbetts
10” is too Tall - looking for about 6” 6/4 wood required for staves - prefer 4/4
3
First Prototype Symmetrically scaled plan to 6” high
Simplified construction Eliminated veneer layers Eliminated multi layers splines
4
Revised Design Prototype too round Top out of proportion to the body
Center divider too thick Created lip for top/body joint Second prototype looked good
5
Parts Neck Top Separator Splines Staves Bottom
6
Stave Cutting Jig Based on Replaceable Throat Sled
My Friend!
7
Stave Cutting Jig First Ten Vessels
8
Dedicated Segment Cutting Sled
Designed to accommodate Bridge City Tool’s Angle Master Large rear fence opening Removable segment slide
9
Vessel Holding Fixture
Used for; Initial glue up of staves Initial turning of the base Final turning of the base Design from PBS TV show and Malcolm Tibbetts book Duct tape help donuts slide
10
Ring Sanding Jig Shown previously in Show-n-Tell
Descriptive article posted on Segmentedwoodturners.org
11
Templates Templates cut out of 1/16” plastic on the laser
Outside only one that proved useful
12
Production Production of 20 broken into three groups - 10, 5, and 5
Manageable number of parts Doable task - not overwhelming Assessed mix after each group Wood combinations that worked or didn’t work Appropriate mix Available material Timeline (best recollection) Design started late Sep, done by third week of Nov Lots of time finding material (tops) and making prototypes, jigs, and templates Four weeks to the first prototype One to two days to prepare material - almost independent of number of vessels Two vessels going simultaneously About a day for each
13
Parts Preparation
14
Parts Assembly and Glue up
15
Top Top opening drilled after finishing - fits tailstock plug - helps alignment during glue up Inside finished with shellac
16
Base/Bottom Lots spinning ! Slow is OK Watch out for those bolt ends!
Inside bottom base cut to blend in with bottom plug, also gives reference for turning inside
17
Turning Base Inside & Outside
Trick is getting a tight fit with top Inside finished with shellac
18
Finishing the Vessel Last step is to make plug to center vessel’s top on the jig
19
All Done ! Used General Finishes sealer and oil/urethane
Buffed with brown paper sack after a week