Presentation is loading. Please wait.

Presentation is loading. Please wait.

PAC 2008 Activities Joan Carletta, PAC Chair 21 June 2008 Denver, CO, USA EAB Public Awareness Committee (PAC)

Similar presentations


Presentation on theme: "PAC 2008 Activities Joan Carletta, PAC Chair 21 June 2008 Denver, CO, USA EAB Public Awareness Committee (PAC)"— Presentation transcript:

1 PAC 2008 Activities Joan Carletta, PAC Chair 21 June 2008 Denver, CO, USA EAB Public Awareness Committee (PAC)

2 RWEP Real World Engineering Projects: Discovery-Based Projects for First-Year EE/CE/CS/EET Students l EAB Joint New Initiative with WIE l Two year project: 2007-2008 l Total budget: $380,000

3 Focus: High-Quality Undergraduate Education Goal is to provide faculty worldwide with: l Fully developed curricula l for first-year EE/CE/CS/EET team-based projects l discovery-based l illustrate real-world problems l solutions impact society l Workshops l for EE/CE/CS/EET faculty l online, self-study l on the best pedagogical techniques

4 Benefits of RWEP l Students discover excitement of real-world problems and understand the importance of IEEE fields to society l Of benefit to all students, but critical for recruiting and retaining women l Former name: Increasing the Representation of Women in IEEE Fields of Interest

5 RWEP Review: A Three-Stage Process l Abstract submission l Reviewed double-blind online, followed by teleconference meeting of review committee l Accepted abstracts are invited for proposals l Proposal submission l Reviewed double-blind online, followed by in-person meeting of review committee l An award is expected for accepted proposals, as long as authors take reviewers comments into account and submit a final project/workshop l Project/workshop submission l Vetted by a volunteer subject matter expert l Ready for posting in the RWEP portal l An award is made

6 Review Criteria for Projects l Relevance l Does addressed problems solution benefit society? l Is context a real-world, contemporary application? l Are connections to real world societal impact explicit? l Quality l Is project straightforward, organized, and complete? l Are descriptions of methods accurate, clear, and concise? l Is project tractable for first year EE/CE/CS/EET students? l Discovery l Does project result in student discovery of an underlying principle or concept? l Does the proposed project illustrate strategies and trade-offs that are important in the engineering problem solving process?

7 Results of RWEP Calls l 2007 l Eight project awards made l Projects to be posted in the RWEP portal l Available to the public after site registration l Approx. three of eight awards extended to women l 2008 l Project abstracts l 21 received, 14 invited for full proposal l Workshop abstracts l 5 received, 2 invited for full proposal l Global participation l authors from US, Canada, Mexico, Western Europe, Eastern Europe and Asia

8 Eight 2007 Project Awards Span seven technical categories: l Circuits l Communications l Computer hardware / architecture l Controls l Human computer interaction l Power electronics l Signal processing

9 2008 RWEP Timeline l Summer 2008 l Post 2007 awarded projects in RWEP portal and publicize their availability l August 2008 l 2008 submitted proposals reviewed (double-blind) at in-person meeting l Best invited to submit projects / workshops for publication l December 2008 l 2008 projects / workshops completed l 2008 awards made to authors

10 RWEP 2008 Goals l Continue to develop RWEP portal l Develop assessment plan to understand impact on student outcomes l Publish and promote inaugural projects l Run second year of calls for projects and workshops l Work out plans for other author benefits (besides monetary award) l Work out plans for continuation funding www.realworldengineering.org


Download ppt "PAC 2008 Activities Joan Carletta, PAC Chair 21 June 2008 Denver, CO, USA EAB Public Awareness Committee (PAC)"

Similar presentations


Ads by Google