Review of Action Plan and Timeline for EScientia Around the World Expansion EScientia Around the World Symposium 8 July 2011 Yvonne Pelham Manager, Education.

Similar presentations


Presentation on theme: "Review of Action Plan and Timeline for EScientia Around the World Expansion EScientia Around the World Symposium 8 July 2011 Yvonne Pelham Manager, Education."— Presentation transcript:

1 Review of Action Plan and Timeline for EScientia Around the World Expansion EScientia Around the World Symposium 8 July 2011 Yvonne Pelham Manager, Education Outreach Educational Activities

2

3 Engagement and Sponsorship 1 Engagement of sites around the world –Engage planning team with museum personnel and section volunteers Establish a forum for partners to oversee the project (i.e. Hyderabad FORUM-SEE) –Establish collaboration agreements Floor space Support Branding

4 Engagement and Sponsorship 2 Research and obtain sponsorship –Identify potential funders and/or corporate sponsors –Draft funding proposal(s) and sponsorship correspondence –Complete review(s) and revisions –Submit to funding organizations and solicit support from corporate sponsors –Secure funding and/or in-kind support

5 Documentation and Promotional Plan 3 Create exhibit documentation –Document operational descriptions and exhibit design drawings –Determine manipulative materials lists (i.e. electronic kits, consumables; etc.) –Develop training and educational materials (inc. review) –Create promotional/press materials

6 Documentation and Promotional Plan 4 Create a Web presence plan and related promotion plan –Build umbrella website on IEEE main site Links to local sites –Establish social media presence

7 Fabrication 5 Fabrication –Secure and prepare floor space (e.g. structural enhancements) –Complete location-specific adaptations/enhancements to design –Complete content localization (i.e. translation, localization) –Contract with IEEE-sourced, museum in- house or local 3rd party vendors to fabricate –Order materials, computers, electronic kits and build exhibit –Install on site

8 Training, Inauguration and Assessment 6 Training, Inauguration and Measure –Training of volunteers and museum staff –Hold Inauguration and distribute press release(s) –Establish and capture metrics

9 Engagement Identify Sites Establish Partnerships Sponsorship Secure Sponsorships Documentation Exhibit Drawings Promotion Plan Fabrication Adaptation and Localization Build Inauguration Training Grand Opening Measure Path Forward

10 E-Scientia Around the World


Download ppt "Review of Action Plan and Timeline for EScientia Around the World Expansion EScientia Around the World Symposium 8 July 2011 Yvonne Pelham Manager, Education."