Radiological Aspects of ILC 2004. 12. 28. Hee-Seock Lee Pohang Accelerator Laboratory 2 nd Workshop of Korean ILC at PAL
2
High Power, High Energy Electron Accelerator, ILC Underground Facility (Natural Shield : 20 m for TESLA, 30 m for ILS) (Natural Shield : 20 m for TESLA, 30 m for ILS) Near Resident Area ( long facility ~ 30 km) Limited No. of Access Point Air Conditioning System with Long Path Water & Cooling System High Power Beam Dump (10 ~ 20 MW, e-beam dump, Bremsstrahlung photon dump) (10 ~ 20 MW, e-beam dump, Bremsstrahlung photon dump) Huge IP (Interaction Point)
4
Radiological Impacts of ILC EM Shower, Photonuclear, SR, Hadron Primary Radiation Secondary Radiation Muon (L Soil = 400 m for 250 GeV ) Residual Activity Environmental Problem Beam Dump Radiation Damage Shielding
5
Radiation for Radiation Worker Tunnel Concrete Activation Equipment Activation Activated Air near Access Point(AP) Activated Coolant in/out of Tunnel Shielding at AP One tunnel or Two tunnel (Access & Rescue) (Access & Rescue)
6
Radiation for Publics & Environments Activated Air near Access Points Soil Activation Ground Water Activation Tritium & Be-7 TESLA Shielding
7
Air & Coolant Activation Air (near IP) Short Half-life Radioisotopes : C-14, N-13, O-15 Short Half-life Radioisotopes : C-14, N-13, O-15 Open Loop (long distance from release point) Open Loop (long distance from release point) Closed Loop (3 h cooling time after 1 month Op, 100 kW) Closed Loop (3 h cooling time after 1 month Op, 100 kW) Water Coolant (Specially, Dump) Tritium, Be-7 : Control of NPP Level for 1 st coolant Tritium, Be-7 : Control of NPP Level for 1 st coolant Helium Tritium : negligible for average loss of 0.1 W/m) Tritium : negligible for average loss of 0.1 W/m)
8
High Power Beam Dump Mechanical Issues 10 ~ 20 MW, preventing leakage 10 ~ 20 MW, preventing leakage Residual Activity around Beam Dump Coolant Activation Fail-safe Interlock Heavy Local Shield to reduce Env. Problems Large Hall & Many Beam Dumps of ILC Dump for Beam and Bremsstrhalung Photon
9
Water Dump In ILC, One dump for e- beam and bremsstrahlung photon No Vacuum Trouble SLAC type Beam Dump for ILC Beam Dump for TESLA
10
Collimations and Damages Multi-stage collimators and Magnetized Iron Spoilers Life-times of Equipments and Detectors
11
Other Issues and Accidents Radiation Monitoring System distributed along long facility : Budget & Operation Publics always exist over the accelerator Accidents Cooling Water Leakage Cooling Water Leakage Melting and Evaporation of Activated Materials Melting and Evaporation of Activated Materials Access Control Fail Access Control Fail
12
Recent Activities KEK : Study on High Power Beam Dump Fermi : Collimation and Background(BDIR) TESLA : General Safety Analysis (Dump and problems near dump are not declared) (Dump and problems near dump are not declared) KEK & PAL 2, 2.5 GeV Electron Beam 2, 2.5 GeV Electron Beam Photonuclear Reaction Study Photonuclear Reaction Study Activation Study of Low Activity Activation Study of Low Activity Concrete Concrete Activity around Water Dump Activity around Water Dump Since 2003(1998) Since 2003(1998)