Mine Safety System Chris Butterfield Frankie Cruz Richard Downs 09/05/2012 Replace outdated mine safety system with modern personnell tracking and vitals monitoring system which includes an additional integration capabilities. STATUS REPORT #1
2
Need / Milestones Replace an outdated personnel safety systems in present mining with a new state of art personnel tracking and vital monitoring system. Reliable heart rate monitoring – 9/30/12 Wireless antenna cluster 9/30/12 GUI mock up, using virtual inputs 9/30/12
3
Heartbeat monitor design GUI layout and requirement Deciding at what location processing will occur Physical layout to include modular design.
4
Reverse engineer chest strap heart rate Respiration sensor conceptualized Transmitting heartbeat over the Zigbees
5
Reverse engineer chest strap heart rate Respiration sensor conceptualized Transmitting heartbeat over the Zigbees
7
Task NameDurationStartFinishPredecessors Mine Safety System129 daysThu 4/19/12Tue 10/16/12 Research14 daysThu 4/19/12Tue 5/8/12 Available Technology14 daysThu 4/19/12Tue 5/8/12 Patents14 daysThu 4/19/12Tue 5/8/12 Rough Design28 daysWed 5/9/12Fri 6/15/124 Heartbeat Sensor A4 daysWed 5/9/12Mon 5/14/12 A/D Converter A4 daysTue 5/15/12Fri 5/18/126 Encoder A4 daysMon 5/21/12Thu 5/24/127 Transmitter A4 daysFri 5/25/12Wed 5/30/128 Receiver A4 daysThu 5/31/12Tue 6/5/129 Microprocessor A4 daysWed 6/6/12Mon 6/11/1210 GUI A4 daysTue 6/12/12Fri 6/15/1211 Order Parts14 daysMon 6/18/12Thu 7/5/125
8
Task NameDurationStartFinishPredecessors Breadboard Construction35 daysFri 7/6/12Thu 8/23/12 Sensor5 daysFri 7/6/12Thu 7/12/12 A/D Converter5 daysFri 7/13/12Thu 7/19/1216 Encoder5 daysFri 7/20/12Thu 7/26/1217 Transmitter5 daysFri 7/27/12Thu 8/2/1218 Receiver5 daysFri 8/3/12Thu 8/9/1219 Microprocessor5 daysFri 8/10/12Thu 8/16/1220 GUI5 daysFri 8/17/12Thu 8/23/1221 Testing/Vaildation3 daysFri 8/24/12Tue 8/28/1215 Improvements Review4 daysWed 8/29/12Mon 9/3/1223
9
Task NameDurationStartFinishPredecessors PCB26 daysTue 9/4/12 Tue 10/9/12 24 Layout (software)5 daysTue 9/4/12 Mon 9/10/12 Etching14 daysTue 9/11/12Fri 9/28/1226 Error Testing3 daysMon 10/1/12 Wed 10/3/12 27 Population4 daysThu 10/4/12Tue 10/9/1228 Final Vaildation5 daysWed 10/10/12 Tue 10/16/12 25