Download presentation
Presentation is loading. Please wait.
Published byAngelina Madden Modified over 11 years ago
1
doc.: IEEE 802.11-08/1060r0 Submission Sept 2008 Jon Rosdahl, CSRSlide 1 P&P Status and Updates Sept08 Date: 2008-09-08 Authors:
2
doc.: IEEE 802.11-08/1060r0 Submission Sept 2008 Jon Rosdahl, CSRSlide 2 Abstract This submission discusses the efforts currently underway in 802 and 802.11 on changing the P&P to comply with the proposed templates from AudCom
3
doc.: IEEE 802.11-08/1060r0 Submission Sept 2008 Jon Rosdahl, CSRSlide 3 P&P Projects and Information 802 LMSC –Currently being Reviewed and commented on Chairs Guidelines LMSC_PNP_080817 LMSC_OM_080817 AudCom WG Operation Procedures –Comments were due on July 31 –802.11 WG asked if comments could be gathered by Sept 11 802.11 –Current P&P posted, changes will need to me made to comply with the new 802 and AudCom templates that are pending.
4
doc.: IEEE 802.11-08/1060r0 Submission Sept 2008 Jon Rosdahl, CSRSlide 4 Current Project Plan Due to the state of the AudCom Template and the fact that a required template is coming from 802 EC, it is prudent to hold changes for a cycle and to contribute to the templates that 802.11 will be subject to. If you have comments on AudCom Template Please submit by Thursday so that the CAC can discuss and a response may be sent to AudCom –AudCom and the SASB meet Sept 24-27, in Seoul, South Korea
5
doc.: IEEE 802.11-08/1060r0 Submission Sept 2008 Jon Rosdahl, CSRSlide 5 References IEEE 802 Prodedural Documents: –http://www.ieee802.org/devdocs.htmlhttp://www.ieee802.org/devdocs.html Current 802.11 P&P –http://www.ieee802.org/11/http://www.ieee802.org/11/ (select Policies and Procedures)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.