Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: IEEE 802.11-09/0445r0 Submission May 2009 Adrian Stephens, Intel CorporationSlide 1 802.11 TGn Editor Report May 2009 Date: 2009-05-11 Authors:

Similar presentations


Presentation on theme: "Doc.: IEEE 802.11-09/0445r0 Submission May 2009 Adrian Stephens, Intel CorporationSlide 1 802.11 TGn Editor Report May 2009 Date: 2009-05-11 Authors:"— Presentation transcript:

1 doc.: IEEE 802.11-09/0445r0 Submission May 2009 Adrian Stephens, Intel CorporationSlide 1 802.11 TGn Editor Report May 2009 Date: 2009-05-11 Authors:

2 doc.: IEEE 802.11-09/0445r0 Submission May 2009 Adrian Stephens, Intel CorporationSlide 2 Abstract This document summarises editorial activities on the TGn Draft since the March 2009 meeting Status of comments from the Sponsor Ballot first recirculation Status of ad-hocs

3 doc.: IEEE 802.11-09/0445r0 Submission May 2009 Adrian Stephens, Intel CorporationSlide 3 Sponsor Ballot First Recirculation (SB2) Comments

4 doc.: IEEE 802.11-09/0445r0 Submission May 2009 Adrian Stephens, Intel CorporationSlide 4 Status by ad-hoc – 2009-05-06

5 doc.: IEEE 802.11-09/0445r0 Submission May 2009 Adrian Stephens, Intel CorporationSlide 5 SB2 Documents TGn DRAFT (members area of 802.11 website) –Draft P802.11n_D9.0.pdf SB composite comments (all ad-hocs) –11-09-0024-08-000n-tgn-sb-composite-comments.xls

6 doc.: IEEE 802.11-09/0445r0 Submission May 2009 Adrian Stephens, Intel CorporationSlide 6 Draft Numbering History (D2.0+) D2.0, February 2007 - TGn and WG approved draft for balloting D3.0, Sept 2007 - Draft for Letter Ballot 115 D4.00, March 2008 – Draft for LB124 D5.00, May 2008 – Draft for LB 129 D6.00, July 2008 – Draft for LB134 D7.0, Sept 2008 Draft for LB136. Draft for first P802.11n sponsor ballot (Dec 2008). D7.01, Jan 2008 – Draft with updated copyright date D7.02, Jan 2008 – Draft with speculative edits of SB0 editorials and minor technicals D8.0, Feb 2008 – Includes resolution of SB0 comments. For ballot. D9.0, Mar 2008 – Includes resolution of SB1 comments. For ballot. D9.01, May 2008 – In preparation

7 doc.: IEEE 802.11-09/0445r0 Submission May 2009 Adrian Stephens, Intel CorporationSlide 7 Process for D9.0 D8.01 was produced and reviewed against approved comment resolutions –Thankyou: Tomo, Doug, Eldad & George D9.0 is identical to D8.01, except for editorial updates: –Hiding the (#CID) flags

8 doc.: IEEE 802.11-09/0445r0 Submission May 2009 Adrian Stephens, Intel CorporationSlide 8 Motion 1 Having approved comment resolutions for all of the comments received from the first recirculation ballot on P802.11n D9.0, Instruct the editor to prepare Draft 10.0 incorporating these resolutions and, Approve a 15 day Sponsor Recirculation Ballot asking the question Should P802.11n D10.0 be forwarded to RevCom?


Download ppt "Doc.: IEEE 802.11-09/0445r0 Submission May 2009 Adrian Stephens, Intel CorporationSlide 1 802.11 TGn Editor Report May 2009 Date: 2009-05-11 Authors:"

Similar presentations


Ads by Google