Bond timeline review Fammatre 3 Classrooms update Solar Project update Steindorf Project update – Lease opportunity at DO Workshop 2
3
3 We are here!
4
Current status: ◦ Budget: $1.65M ◦ Construction documents are in the works using pre-approved plan ◦ Target DSA “over the counter” review March 16 ◦ Lease, leaseback with Bruns Belmont for the building. Award March 20 ◦ Bid sitework and utilities. Award April 3 ◦ Start construction end of April ◦ Complete construction mid August 4
5
5 3 New Kindergarten CR’s
6
6
7
Current status: ◦ Budget: $4.7M ◦ Request for Proposals is being drafted by KPDC ◦ Send to solar providers in March ◦ Receive proposals and select solar provider in April ◦ April notice to proceed with design ◦ September or October possible construction start 7
8
Current status: ◦ Budget: $16.5M ◦ Committee established STEAM requirements ◦ Curriculum synopsis board presentation tonight ◦ Building requirements board presentation tonight ◦ Proceed with Schematic Design (SD) ◦ SD presentation to board on April 17 ◦ April – May. Pause until bond election. ◦ June 2014 – April 2015 CEQA, construction documents, permitting and bidding ◦ May 2015 construction start 8
9
STEAM Curriculum Synopsis: School-wide focus on STEAM Curriculum ◦ Project-based learning: “Learning by doing” STEAM Labs and Makers Labs ◦ Integrated Curriculum ◦ Common Core State Standards in action More informational Text Depth of Knowledge ◦ The 4 Cs of 21 st Century Skills Risk Taking 9
10
Putting the “A” in STEAM Four areas of the Arts ◦ Visual Arts ◦ Music ◦ Theater Arts ◦ Dance Integrated Curriculum Examples ◦ Mathematics – Visual Arts & Music ◦ Language Arts – Theater & Digital Media ◦ Science – Visual Arts, Music, & Makers Labs ◦ Physical Education – Science & Dance 10
11
STEAM Space Requirements: ◦ Modernize existing buildings totaling 25,000 sf and add two new buildings totaling 9,000 sf. Sustainable construction with LEED certification. ◦ 2 modernized classrooms per grade K8 = 18 CR’s (1 is new) ◦ Flexible multi-use space for dining, performing arts, PE ◦ Typical administrative support spaces and restrooms ◦ Flexible Media Center ◦ Flexible Makers Labs ◦ Flexible Science Lab ◦ Flexible outdoor learning spaces in courtyards ◦ Outdoor amphitheater for performing arts ◦ Parking and play areas 11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
Potential ability to accommodate some displaced Steindorf Tenants at the DO Existing workshop 3,500 sf is underutilized. Could be quickly renovated and leased along with some of maintenance yard. Build a new smaller workshop. 2,000 sf Expand maintenance yard into front parking lot. Estimated cost around $1.3M 19