Resume of the 1 st meeting (SNU Korea): Uninterrupted power supply Stable internet connection Telescopes: mirror recoating Improving of living conditions: transportation, dormitories, water supply technician and night assistance teams
3
Maidanak: telescopes and instruments 6 telescopes: 1.5m, 1m, 4x60cm (4 of them in operation) 5 CCDs: SI 600 Series 4K, SITe 2000x800, 2x FLI IMG 1K, SBIG ST9-XE 0.5K Direct Imaging only (in optic), No IR No Spectra
4
Stable Internet: done ! 2007-2010: extremely hard paperwork Satellite based VSAT system, www.steccom.ruwww.steccom.ru Owner: AstroTel Ltd, Boris Satovski (under agreement with UBAI) 8 MB/sec down, 384 KB/sec up (chargeable down/up) Cost estimation: 1 GB/month for US$ 700
5
Telescopes: recoating - partially done June 2009- June 2010: recoated at Okayama Obs., Japan 60 cm 48 cm Funding: JSPS+NAOJ+Okayama (1 wooden box, 2 mirrors, round-trip shipment) Not yet recoated: 1.5 m 1.0 m 2 more 60 cm
6
Telescopes: cleaning – two 60cm June 2009 – 60cm mirror at Zeiss600-Kiev October 2009 – 60cm mirror at Zeiss600-Moscow October 2008 – 1.5m mirror at AZT-22 (~1mag deeper) (next cleaning – fall 2010 or fall 2011)
7
Telescopes: reflectance as of Oct 2009 1.5m – > 80 % 1.0m – < 50 % 2x60cm – 65-75 % (Okita Kiichi-san, Okayama Obs.)
8
Uninterrupted Power Supply: no changes Governmental supply: failed and becoming more trouble year by year Diesel + oil supply: the ONLY way for Maidanak Users Current cost estimations in US$ : Diesel - 50-60K Oil supply – 40K (for 40 tons)
9
Uninterrupted Power Supply: 60cm scopes Individually Power Supplied Scopes (using powerful battery): Zeiss600-Kiev – almost done Zeiss600-Moscow – in project for 2010 (Artamonov and Magnitskii, SAI Russia) FYI: Individually Power Supplied system had been already realized at AstroTel-Maidanak Telescope (AMT-1) Satovski (AstroTel Ltd)
10
Living conditions: no changes Transportation problem: Tashkent-Samarkand by train – no problem Samarkand-Maidanak – still a problem need 2 cars (at least) for transportation/logistic Dormitories: 2 dormitories need to be reconstructed and/or repaired Water supply: still primitive (bringing by truck from the spring) 5-6 times/year no regular shower, no WCs
11
Tech and night ass teams: no changes 1.5m scope: 1 regular night assistant from Kitab 2-3 visiting observers/month (summer-fall seasons) 1m scope: no regular program, no assistant at all two 60 cm scopes: 1 episodically observing assistant from Tashkent 1-2 visiting observers/month (summer-fall seasons) Technician team: 5 people managed by Abbas Aliev
12
Summary of 1yr activity: Internet – done Recoating – 1 mirror done, 4 mirrors not yet Power supply – nothing changed, currently ~100K$ individually buttery supplied system ? Living conditions – nothing changed: transportation, dormitories, water Tech+ night ass teams – nothing changed: the both teams should be enlarged
13