Presentation is loading. Please wait.

Presentation is loading. Please wait.

Technical Group Research suggestions. Cross-cutting issues Proper marketing / IEC Pilot implementation.

Similar presentations


Presentation on theme: "Technical Group Research suggestions. Cross-cutting issues Proper marketing / IEC Pilot implementation."— Presentation transcript:

1 Technical Group Research suggestions

2 Cross-cutting issues Proper marketing / IEC Pilot implementation

3 1. Improvement of designs Evaluation of existing designs with respect to –Filling rate/size –Ease of Operation & Maintenance –Indigenous knowledge Provision of cheaper / other designs Alternative materials Improved O&M procedures

4 2. Value of Waste Determination of the value in various uses: –As fertilizer –In biogas Value of health and other improvements from having a latrine Solid waste can be included

5 3. Supervision of works Result of introducing independent supervision –Payment of supervisor –Teachers / headmaster

6 4. Rain water harvesting Design of collection roof Possibility of saving water in the dry season

7 5. Others Water needs assessment Siting of boreholes Health Impact Assessment Reuse of waste water Water quality aspects


Download ppt "Technical Group Research suggestions. Cross-cutting issues Proper marketing / IEC Pilot implementation."

Similar presentations


Ads by Google