Download presentation
Presentation is loading. Please wait.
Published byMaud Willa Potter Modified over 9 years ago
2
1
3
2 Design Of An Electrical Traction System For An Electrical Scooter by PED Adrian Timbus Alex Marius Fogorosi Constantin Mihai Nicu Zsolt Istvan Sepa SUPERVISORS Ewen Ritchie Remus Teodorescu
4
3 Contents Introduction Theory P1 period P0 period
5
4 Introduction Why electrical scooter? pollution noise in towns future solution Who is the beneficiary?
6
5 What we need for the this project? skills Introduction knowledge equipements scooter electrical motor supply control system Scope of the project
7
6 Theory
8
7 Theory control Power converter MotorTransmission supply Driver’s command Wheel
9
8 AC Motors induction motor synchronous reluctance motor switched reluctance motor DC Motors DC brush motor DC brushless Theory control Power converter MotorTransmission supply Driver’s command Wheel
10
9 Theory control Power converter MotorTransmission supply Driver’s command Wheel DC/AC DC/DC
11
10 Theory control Power converter MotorTransmission supply Driver’s command Wheel Supply – special battery for traction systems
12
11 Theory control Power converter MotorTransmission supply Driver’s command Wheel speed control torque control both of them
13
12 Theory control Power converter MotorTransmission supply Driver’s command Wheel direct transmission gear transmission belt transmission
14
13 P1 Period
15
14 P1 Period Planning Motor selection Battery selection Design of Control Strategy Weekly report Simulatio n Implement the Strategy Module report Supervisor meeting Test Practical Work P1 Report No Yes No Yes
16
15 P1 Period Time schedule 8 th. Oct. 15 th. Oct15 th. Nov 19 th.Dec Programming the controller and implement the strategy Choose motor and supply Control Stategy Design Practical Work and Documentation
17
16 P0 Period
18
17 P0 period expectations time schedule analysis
19
18 P0 Period Expectations: learn how to plan and split the job learn how to organize a project recognaize our background learn how to work in team find informations share knowledge how realize a documentation and presentation
20
19 P0 Period Time schedule Confusion Searching and reading informations Analyze the information and develop the main ideas Develop the project structure and writing P0 report 4 th. Sept.11 th. Sept.18 th. Sept.25 th. Sept.3rd.Oct. Weekly Report
21
20 P0 Period Time schedule 4 th. Sept. Confusion 11 th. Sept. what project to choose looking for classroms solving accomodation problems
22
21 P0 Period Time schedule 11 th. Sept. Searching and reading information 18 th. Sept. in the library on the net
23
22 P0 Period Time schedule 18 th. Sept. Analyze information and develope main ideas 25 th. Sept. selecting relevant information sturcture information
24
23 P0 Period Time schedule 25 th. Sept. Develop the project structure and writing P0 Report 3 th. Oct. develop the frame of the report elaborate the P0 report
25
24 P0 Period Analysis things we have done well things we have to avoid things we have to improve
26
25 P0 Period Things we have done well everybody listen to each other no problem with deadlines split the job well share information
27
26 P0 Period using native language in group meeting Things we have to avoid Things we have to improve using English to comunicate in group meeting
28
27 Any question and suggestion are wellcome!!!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.