Download presentation
Presentation is loading. Please wait.
Published byBruce Haynes Modified over 9 years ago
2
Sustainable travel for Limerick and Area By Professor Lewis Lesley
3
Urban and regional travel is unsustainable ? High dependence on private car Need to import oil Carbon emissions Congestion Health and safety High dependence on private car Need to import oil Carbon emissions Congestion Health and safety
4
The alternatives to car: Short journeys (under 5km = 50% of trips) Walk Cycle Public transport telephone Longer journeys (over 5km = 50% of trips) Public transport telephone SShort journeys (under 5km = 50% of trips) WWalk CCycle PPublic transport ttelephone LLonger journeys (over 5km = 50% of trips) PPublic transport ttelephone
5
Public Transport The Irish Model for last 50yrs State Run - CIE and subsiduaries Capital investment - public funds Operating subsidy - taxes Result overall decline State Run - CIE and subsiduaries Capital investment - public funds Operating subsidy - taxes Result overall decline
6
Public Transport new model ? EU directives Competition and commercial Clarity of funding Need for major capital investment Greater than public funds Competition with health, education etc Problems in subsidies Unsustainable and EU anti competitive ? EU directives Competition and commercial Clarity of funding Need for major capital investment Greater than public funds Competition with health, education etc Problems in subsidies Unsustainable and EU anti competitive ?
7
Public transport - Other aspects Oil dependent Dublin priorities LUAS non CIE operator Needs of other Irish Cities Oil dependent Dublin priorities LUAS non CIE operator Needs of other Irish Cities
8
Can public transport be commercial ? EU Directives - requirements Taxis always commercial Need to have market based fares ? Costs supportable by revenue ? New technologies ? EU Directives - requirements Taxis always commercial Need to have market based fares ? Costs supportable by revenue ? New technologies ?
9
Energy sustainability Public transport - electrically powered Wind generation 17th Sept Total Demand * Can sustain whole of Irish Public transport
10
Financial Sustainability Fares do not cover operating costs Generate surplus power Cross subsidise Total investment modest FFares do not cover operating costs GGenerate surplus power CCross subsidise TTotal investment modest
11
Market Research Getting people to switch some car trips EU experience Rail acceptability Park and Ride Making rail affordable Getting people to switch some car trips EU experience Rail acceptability Park and Ride Making rail affordable
12
Getting people to switch some car trips Modal Choice model (1)Reliability (2) Speed (3) Frequency (4) Fares
13
Switching from car: Rail acceptable (reliable, and fast) Park and Ride (increases hinterland) Good info (use of mobile phones) Convenient fares (like buying petrol) Light rail proven in EU, US and Canada Changing job/house - choose light rail RRail acceptable (reliable, and fast) PPark and Ride (increases hinterland) GGood info (use of mobile phones) CConvenient fares (like buying petrol) LLight rail proven in EU, US and Canada CChanging job/house - choose light rail
14
The New Limerick Model ? Light rail - affordable and attractive to car users Electrically powered Integral renewable generation Surplus power sold Power + fares = commercial Supports investment from private funds Light rail - affordable and attractive to car users Electrically powered Integral renewable generation Surplus power sold Power + fares = commercial Supports investment from private funds
15
Limerick LUAS - First Ideas P & R Airport P & R
16
Alignment Options Railway alignments and options Road alignments New alignments
17
Studies underway MVA Shannon Airport Access Dedicated rail link not viable Sixmilebridge new Bus/train interchange Express buses through New Town to Airport MVA Shannon Airport Access Dedicated rail link not viable Sixmilebridge new Bus/train interchange Express buses through New Town to Airport
18
Already committed ? RRetracking Westrail between EEnnis and Athenry SSixmilebridge new station NNew Shannon crossing
19
Sixmilebridge new station Modernised Ennis Rail/Bus station
20
Regional Potential Rail open Rail closed Rail being relaid Airport Bus Galway Limerick Shannon Ennis Gort Athenry Cork Dublin
21
Urban and Interurban Incremental low cost electrification Light Rail operation Lower cost service New stations affordable Faster and more frequent service eg. -Ennis every 30 mins, journey 30mins -Shannon (Sixmilebridge) journey 15mins -Galway every hour, journey 80mins Incremental low cost electrification Light Rail operation Lower cost service New stations affordable Faster and more frequent service eg. -Ennis every 30 mins, journey 30mins -Shannon (Sixmilebridge) journey 15mins -Galway every hour, journey 80mins
22
Capital Costs Electrifying rail alignments Constructing tracks in streets Depot Stations and Park and Ride facilities
23
Operating Costs Estimates and Reviews EU best practice Staff Maintenance Power Repairs and replacement
24
Revenue Passenger fares Freight income Power sales Passenger fares Freight income Power sales
25
Business Case Revenue - Operating costs Capital investment Reflects the role of Local Authorities Development attracted to stations Revenue - Operating costs Capital investment Reflects the role of Local Authorities Development attracted to stations
26
Community Benefits *Multiplier effect to the local economy *Sustainable operation, *Electrification + renewable generation *More public money for other projects *Less congestion *Better air quality *Less oil dependent *New areas accessible *Improves attractiveness of City Centre *Multiplier effect to the local economy *Sustainable operation, *Electrification + renewable generation *More public money for other projects *Less congestion *Better air quality *Less oil dependent *New areas accessible *Improves attractiveness of City Centre
27
Next steps -Partnerships with public bodies -Developing links with business -Setting up company -Attracting (private) funds -Building up capacity -Drawing up plans -Planning Approval -Building and operating -Partnerships with public bodies -Developing links with business -Setting up company -Attracting (private) funds -Building up capacity -Drawing up plans -Planning Approval -Building and operating
28
Conclusion Rights of way = underused assets Renewable generation for electric trains Sustainability = energy and financially Fundable by private sector (commercial) New access for community development Fits National Plan Framework Reduces demands on public purse Rights of way = underused assets Renewable generation for electric trains Sustainability = energy and financially Fundable by private sector (commercial) New access for community development Fits National Plan Framework Reduces demands on public purse
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.