1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Overview of activities of the first six months and of the next six months Angelo Frascella
2
2 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 2 We are here!
3
3 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 TaskRespons.Foreseen EndDeliverableStatus 1.1 User Requirements DITFM6 → April 30 th Results in D1.2 (M9) Available excel file with scenarios, 1.3 Mapping of enterprise data DOMINAM6 → April 30 th D1.1 (M6)Deliverable available (to review) T1.4 Services and tools definitions AUEBM6 → April 30 th D1.3 (M9)Deliverable at good point of preparation T2.1 Infrastructure capturing and storing energy data AUEBM5 → March 31 th Results in D2.1 (M7) Draft deliverable available (to review) Ended Tasks
4
4 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 TaskRespons.Foreseen EndDeliverableStatus T2.2 Consumption of supply chain processes… DITFM7 → May 31 th Results in D2.1 (M7) Index under construction T3.1 Energy-driven algorithms AUEBM8 → June 30 th D3.1 (M8)Running (no working draft available) T1.2 Energy Efficiency Indices ENEAM9 → July 31 th Results in D1.2 (M9) Energy audit under analysis. Deliverable under construction (still not distributed) T5.1 Overall Architecture INTRAM11 → September 30 th D5.1 (non official interim: M11 and M16) Running (index and some parts available) T2.3 Energy Consumption reduction tool ENEAM12 → October 31 th D2.2 (M12)Running (no working draft available) Running Tasks
5
5 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 TaskRespons.Start dateForeseen EndDeliverable T3.2 Optimized operations Tools ATCM5 → March 1 st M10 → August 31 th D3.2 (M10) T2.4 Energy Monitoring Tools Design ATCM6 → April 1 st M12 → October 31 th D2.2 (M12) T2.5 Energy Monitoring Tools Development INTRAM8 → June 1 th M12 → October 31 th D2.4 Task 4.1 Energy Forecasts and Energy Trading Services ENEAM8 → June 1 th M12 → October 31 th D4.1 (M12 interim version) Task 4.2 Carbon Trading Services AUEBM9→ July 1 th M13 → November 30 th D4.2 (M10 interim version) Starting Tasks
6
6 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Data Structure Scenarios and use case/services at good point 7 technical deliverable has to be delivered within M12 One is almost ready (D1.1 – M6) An incoming one (D2.1 – M7) collecting results from T2.1 and T2.2 seems in at good point for T2.1, still not available for T2.2 part Next deliverables: D3.1 – M8 (AUEB), D1.2 – M9 (DITF), D1.3 – M9 (AUEB), D3.2 – M10 (ATC), D2.2 – M12 (ATC) In synthesis
7
7 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Some general results required in the first months First needed results inside the project (from KoM decisions) – WP1: Scenarios definition - DITF => done Services and tools definitions – AUEB => done Identification of machine and processes - DOMINA=> running Assessment of scenarios with Piacenza – ENEA => done Definition of parameter that have been optimized – ENEA => running Collecting and analysis of consumption data – ENEA => running Validation of Scenarios by IIG – EURATEX => ongoing – WP2: Needed data and meters - AUEB-RC => to do? Available data and meters – DOMINA => to do
8
8 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Some general results required in the first months – WP 3: Set of real data about production scheduling and routing collected in the space of two weeks – DOMINA and DITF => To do – WP 5: Definition of questions that need an answer in order to allow to define the architecture requirements – INTRA => done? Decision about UML tool to use – INTRA => done First analysis about data format for interfacing ERP and MES (from TEXWIN) and supply chain partners (MODA-ML) (ENEA and DOMINA) => to do – WP 8 Wiki structure and content about ARTISAN Architecture => done (and, up to now, not used)
9
9 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Deliverable dashboard on the web site Please, watch the dashboard: http://www.artisan-project.eu/artisan/imple/pgcl.asp?lingua=en&p=462&node_id=7.4 Or, by menu, RESERVED AREA -> DELIVERABLE LIST
10
10 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Don’t forget to send me filled templates about: – Activities reporting for the first six months – Periodic Progress report for the first six months – Timesheet for the first six months A remainder
11
11 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Thank you for your attention