The energizes
2
Energy plus house Leusden
3
Index Installations. Geothermal power pump. Cost calculation Geothermal power pump. Solar collectors. Solar panels. drawings. architectural. H-tec. benefits electric car. Architect Johannes out. General information.
4
Installations Geothermal power pump. Solar collectors. Wind turbine. Solar panels.
5
Geothermal power pump The ground heat exchanger. The heat pump. Delivery system.
6
Costing Geothermal power pump Geothermal power pump € 7.000 source € 6.000 insulation € 3.500 LTV € 4.000 Installation € 2.000 total €22.500 off subsidy € - 5.000 Rest €17.500
7
Solar collectors working solar collectors
8
Solar panels
9
Drawing
10
Architectural Well isolated. Materials with high rc (6.9) Base.
11
The external walls
12
H-tec Electric car. 1 to 100 8,0 seconds Range 400 km Battery lithium-ion Type elektrisch Topspeed 160 km/h power 101 pk (75 kW)
13
Benefits electric car No BPM No addition No road tax. No CO 2 emissions 10.000 charing points Super modern cars No noise Home charging electric car
14
Architect Johannes out Fellow owner InnoConstruct B.V Architict of his own house.
15
General information Address: Railway Damreesche 22, 3832 KR Leusden Start of construction: September 2007 Completion: March 2009 Dwelling size: 1,000 cubic meters Construction cost: 600.000 to 700.000 euros Client: InnoConstruct BV + www.innoconstruct.nl User: John and partner Marianne Out Architect: John Out Building system: Styro Stone + www.styrostone.nl Foundation: Misapor + www.misapor.ch Mobility: Eneco + www.eneco.nl Wind: Everkinetiq + www.everkinetiq.n Home: Automation: Moeller + http://benelux.moeller.net Installation: Kath, Wolff & Partner + www.kath-wolff Partner. Energy Management: Nedap + www.nedap.nl Windows and heat pump: Schüco + www.schueco.com Climate: Siegmund + www.eht-siegmund.com Landscaping: Va + Voum www.vavoum.com Willow Fence: The Vlechterij + www.vlechterij.nl Mobility: Eneco + www.eneco.nl Calculation of energy efficiency: Consultancy Nieman + www.nieman.nl
16
Conclusion Building materials Outside wall Piles
17
Made by: Jacob and Feike
18
Index - First project - Second project - Heating - Energy generation - Sustainable elements - Drawings of the house - Conclusion - End of the presentation
19
First project - First project was Czech Republic - House - Hotel - Had different sustainable facilities - Little of information about the energy plus house
20
Second project - Second project is Dortmund, Germany - Designed by a group of students - Build in 2007
21
Heating - Using blades with solarcells - No Geothermal - Using Heat pumps for hot water and heat indoors - Much insulation applied
22
Energy generation - Use of a second facade - Blades with solar cells on the South, East and West side - Solar panel on the roof - Connected to the mains, but only to the selling energy
23
Sustainable elements - North glass is four-layer - East- South and West side are three- layer
24
Drawings of the house Section wall with BladesFloor plan: first floor + second floor
25
Conclusion Solar panels are nicely incorporated into the blades. House produces more energy than it cosumes.
26
Made by: Jacob, Feike, Pieter and Bonne
27
Foreign project - Solar cells on blades - Using a heat pump for heating and making electricity - Has a veranda that saves heat - Modern look - Remaining energy is sold
28
Domestic project - There is an electric car drive on the remaining energy - Traditional look - Using geothermal and sun for making heat - Base is made by waste
29
Conclusion - Choice goes to Leusden - Leusden has a traditional look - The remaining energy is better spent - Base is made by waste