Download presentation
Presentation is loading. Please wait.
Published byDustin Powell Modified over 9 years ago
1
ECS for Front-End crates MARATON
2
2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each Front-End crate, which have to be powered on before taking data. One MARATON power supplies consists in 4 channel, all of them must be switched on/off in parallel. MARATON power supplies are accessible via INFDAI1 PVSS project or via the main ECS LHCb project, which allows to switch on/off all or part of the power supplies.
3
3 Definitions RCM: Remote Control Module, the electronics board which controls remotly the MARATON power supply. Power Rectifier: transforms 220 AC into 380 DC
4
4 Location of hardware: plateform Maratons are inside the cavern: L3BXX U L3BXX M L3BXX L
5
5 Location of hardware: plateform L3A01L3A11
6
6 Location of hardware: B1B01 rack Second Rack behind barracks, first level Rack containing RCM and Power Rectifiers for CALO Maratons. This rack is only used by CALO.
7
7 Rack B1B01 (CALO RCMs) Power rectifiers for C-side: corresponding MARATON is identified by a label on each box RCM Crate for C-side Power rectifiers for A-side: corresponding MARATON is identified by a label on each box RCM Crate for A-side
8
8 How to switch on a crate from PVSS Before switching OFF a crate, ask the Shift Leader to stop the run. Open the “Wiener Maraton Crates” status panel: G:\online\ecs\Shortcuts311\INF\INFDAI1\INFDAI1_UI_lbRackMaratonC rateStatus.lnk (WINDOWS) /group/online/ecs/Shortcuts311/INF/INFDAI1/INFDAI1_UI_lbRackMara tonCrateStatus.sh (LINUX)
9
9 Click to switch ON/OFF
10
Alternative method: from the main ECS project Open LHCb FSM tree panel: G:\online\ecs\Shortcuts311\LHCb\ECS\ECS_U I_FSM.lnk (WINDOWS) /group/online/ecs/Shortcuts311/LHCb/ECS/E CS_UI_FSM.sh (LINUX)
11
In the DAI tree, right click on PRS/ECAL/HCAL_DAI This will open: Click on the Side
12
Locate the crate to switch ON/OFF, and click on the « READY » or « OFF » button. Select the « Switch_OFF » and « Swich_ON »
13
13 In case of problems In case of a DSS Alarm on the calo platform, power will be cut at the source (rack B1B01). Before being able to switch on the Maratons back: DSS piquet (168000) and the run chief (161868) have to be called to switch back on the power of the rack B1B01 (TDM Drawer) The crate of the RCM has to be powered on manually going in the cavern Power rectifiers have to be verified they are all ON
14
14 In case of problems If one crate has to stay off for a given time (changing the boards inside, problem with the boards, etc...), to prevent from accidental switch on from PVSS: Switch off manually the corresponding power rectifier Write in the log book why Put a sticker on the power rectifier with your name Corollary: if a rectifier is OFF, look in the logbook why before switching it ON.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.