2 Overview AIM I/II/CPM-LO Module user training Webified AIM Review of changes/pending changes/fixes of interest AIM support issues

3 AIM I/II/CPM-LO Module User Training NAWCTSD continues monthly user training convenings in Norfolk and San Diego Continue to move toward CPM/LO Module convenings – reducing AIM II convenings and limit AIM I to 1 convening a year Convenings in other areas available based on coordination with Eric Pfefferkorn and activity funding Working with N7 on continuous improvement of training

4 LO Module Integration into web-based CPM Long-term plan is to integrate LO Module functions into CPM as a fully web-based application ‒ Phase 1 (approx. 50% of full desktop client LO Module functionality) Funded and accepted by govt in Jan 14 ‒ Phase 2 (approx. 20% additional increment of desktop client functionality) Funded - delivery scheduled Nov 14 ‒ Phase 3 (100% of desktop client functionality and operational replacement for AIM I/AIM II/ LO Module desktop client) Unfunded - schedule and required funding are TBD based on several factors, including freeze of desktop client enhancements that will need to be incorporated into the Phase 3 version of webified LO Module

5 LO Module Integration into web-based CPM (contd) Future Implications ‒ Phase 3 Development ‒ Segmented Testing ‒ Conversion of existing LO Module content; Trainee Guides ‒ System Load ‒ Specific Timeline / Work Plan

6 Review of Changes/Pending Changes/Fixes

7 CPM Release 5.6 General ‒ Login: o Changed the way the DoD notices are displayed. o Updated the software when EDI Numbers are used for logging in, disabling the change and reset password options. o Added ability to restrict login to only be through CAC access (currently this option is disabled). o Changed email messages when user with CAC access requests account reactivation. ‒ Fixed an issue which would cause the display of certain pages (JDTA and Objectives, mainly) to take an extremely long time to display. ‒ Bug 113: Additional checks to make sure only users with the appropriate privilege actually can display the various screens. ‒ Bug 122: Changed the look of the Resequence screen to make it look like other screens and to generally work.

8 CPM Release 5.6 (contd) JDTA ‒ Req. 5.64: Users can now be given Administrator privilege at the Occupation level. ‒ Req. 5.67: Added ability to select more than one Object (e.g. Platform, System, etc.) for a Task, Subtask, or Step. ‒ Bug 109: When displaying Existing Interventions data, only display Lessons/Sections which are called out in a Project. ‒ Added new field, Proficiency Level, for Tasks, Subtasks, Steps (will be used in the future with the incredible FEA functionality soon to be implemented)

9 CPM Release 5.6 (contd) Projects ‒ Req. 5.45: User can now select multiple JDTA items for a Module/Lesson/Section. ‒ When printing the TPP and TCCD, no longer print the CCMM information if no CDP is specified (this is to bring it in line with AIM I/II). ‒ Removed the Per Inst/Tr/Class fields from the Training Site Resources screen, as they were never printed. ‒ Bug 111: When exporting to the EDE, ISD Considerations should now keep paragraph breaks. ‒ Bug 116: Fixed the issue where changing of the title or number of a Resource would not automatically update any related Objective text. ‒ Bug 145: There should now be a scroll bar on the Objective editing screen when it is needed.

10 CPM Release 5.6 (contd) Home ‒ For the sake of security, removed the System Users tab. Data/Resources ‒ Added new Related Materials output for a selected Data Item/KSATR/Resource. Note: This is found on the associated screen, not the Reports tab. OCCSTDS ‒ Convert special characters of single- and double-quotes during import so they don’t display as boxes.

11 AIM I/II/LO Module Release 5.X – Sep14 Major new release that will require Citrix Central Site shutdown and full new install for non-Central Site users User testing on NETPDTC test server prior to release All testers MUST have valid ESS accounts to participate in testing of this major new release Coordinate with Doc Matzko to identify yourself as a tester and get ESS account set up promptly

12 AIM I/II/LO Module Release 5.X – Sep14 (contd) New capabilities to be included in this release: TO #Req. #SourceDescription 00095.21ACR 198LO Module replace RRLs 00095.22ACR 191LO Module support for Faults 00095.23ACR 167LO Module support for linking to later IETMs 00095.24Voice of customerAIM II volume numbering 00115.26Voice of customerCPM Training Project Plan (TPP) update 00115.33Voice of customerLinking of TG Sheets in the LO Module 00115.36FRB AI 201Support for Distribution Statements in AIM curricula 00115.37Voice of customerRe-import of finished self-paced learning content from CBT toolset into LO Module 00125.41ACR 241Expand PC Sim category in LO Module RRL 00125.48ACR 166No-change Change in LO Module 00125.56ACR 248Modify Supplier and Doc Number fields in Site RRL 00185.62ACR 219LO Module RIA/Resource tab combination 00275.73Approved ECPEnhanced performance test support in LO Module 00275.80ACR 263Change terminology in software from IMI to IMM 00275.81ACR 214Add IMI/IMM as resource for practice/assessment question 00275.82ACR 284Graphic source file folder link in LO Module 00275.83ACR 202Ability to add sub-elements to self-paced instruction

13

14

15

16

17 AIM Support NAWCTSD ‒ AIMEREON ‒ Movement for Remedy ‒ User Account Management ‒ Information Assurance requirements, keep logging in