Financing Renewable Energy Projects OVERVIEW OF PROJECT DEVELOPMENT ISSUES 5 June 2014 Tony Colonnese Director of Engineering Services
3
2014 ADC DEFENSE COMMUNITIES NATIONAL SUMMIT | PAGE 3 Ameresco Renewable Energy Experience DOE Savannah River Site – Biomass Arizona State University – PV Landfill Gas to Energy Fort Detrick – PV
4
2014 ADC DEFENSE COMMUNITIES NATIONAL SUMMIT | PAGE 4 Homework Prior to Issuing an RFP Economic Viability of a Project Current Utility Rates State Incentives – Renewable Portfolio Standard (RPS) Condition of Existing Infrastructure Internal Support for a Project Surplus Land Suitable for Development NEPA Environmental Assessment
5
2014 ADC DEFENSE COMMUNITIES NATIONAL SUMMIT | PAGE 5 Sample of Major Development Steps Utility Interconnection Study and Agreement Load Integration Study (Behind the Meter) State Environmental Permitting Storm Water Management & Erosion Control Emissions Controls Wetlands, Floodplain Endangered Species Cultural Resources, Historic Preservation Other Unique to State – e.g. Afforestation NEPA Environmental Assessment Site-Specific Conditions
6
2014 ADC DEFENSE COMMUNITIES NATIONAL SUMMIT | PAGE 6 Other Important Development Steps Local Planning Cyber Security Site Lease Issues Title Encumbrances Access
7
2014 ADC DEFENSE COMMUNITIES NATIONAL SUMMIT | PAGE 7 Development Timeline Utility Interconnect Study – 3 to 6 months Environmental Permitting – 4 to 12 months NEPA Environmental Assessment – 6 to 12 months Title Search / Land Survey – 2 to 4 months Final Contract Negotiations – Ongoing Other DoD Approvals – 2 to 6 months. After All Else Done but Preparatory Work Important