The Basics of CFI ABMB CFI.avi At-Grade Intersection Left-turns happen in advance of the main intersection Movements occur simultaneously This eliminates phases from the signal More capacity Less Congestion Intuitive to drivers (turn left to go left) Many possible configurations
3
CFI Efficiency 650 Conventional 4-lane roadway 650 v/l/h x 4 lanes = 2600 v/h C=150 P.M. Peak
4
CFI Efficiency Conventional 4-lane roadway 650 v/l/h x 4 lanes = 2600 v/h C=150 P.M. Peak 650 CFI 4-lane roadway 850 v/l/h x 4 lanes = 3400 v/h C=120 P.M. Peak 850
5
Some History Concept Developed over 25 Years Ago Featured in Numerous Research Efforts & Publications Over 60 Currently Operating AASHTO’s 2002 National Award for Innovation
6
More History 2002 -- LADOTD and ABMB Began Discussing Possible CFI Applications Construction of the Airline / Siegen CFI Began in the Summer of 2005 Then …
7
Katrina… 9/19/20157 Katrina...
8
Katrina Effects Construction Delayed for Several Months Influx of Temporary and Permanent Residents 24-Hour Counts Still +19% Over Pre-CFI Volumes Peak Hour Counts Increased Erratically
9
Design Volumes (Projected 2004) Post – Katrina Volumes (May 8, 2007) 846 592 575 432 Free 1638 128 327 1022 285 57 428 361 1599 1634 1766 5845 Free 1913 153 317 1201 318 342 667 327 104 537 310 951 1336 1836 2366 6489 Airline Hwy. Siegen LaneSherwood Forrest Airline Hwy. Siegen LaneSherwood Forrest -42% 16% -24% 17% 20% -3% 18% 12% 82% 25% -14%
10
March 21, 2006 – Opening Day
14
The Bad News Actual Volumes Much Higher Than Design Volumes Katrina “Avoiders” Returned to Intersection Unbalanced Increases Made Timing Adjustments Challenging The Good News Operations Greatly Improved Travel Times down 40% Average Delay Less than ½ Previous Driving Public Satisfaction Safety
15
Cumulative Accident Data: Twelve Month Period (March-March)
16
Cumulative Accident Data: Six Month Period (March-September)
17
Preliminary Safety Analysis Total Accidents Down 25% Serious Accidents Down 34%
18
Misconceptions Confusing to Drivers What if the Power Goes Out?
19
Public Acceptance
20
Day Before Opening
21
4 months later
22
The Advocate 05.20.2006
23
225 Magazine June 2007
24
The Advocate 07.11.2006
25
Public Acceptance Survey
26
Question 3a: State below whether you think the improvements make TRAFFIC CONGESTION Better, Worse, or the Same…
27
Public Acceptance Survey Question 5. Please indicate your level of satisfaction with the current traffic conditions of the intersection. 92% Satisfied
28
LADOTD CFI Task Force Formed to evaluate this and future CFI’s Comprised of key LADOTD department heads, FHWA, City, Law Enforcement and consultant The study looks at Operational Performance, Design Elements, Safety and Public Acceptance Final report coming soon (3 months +/-) FHWA Unconventional Intersection Study Study will evaluate operational performance, safety and driver behavior for 3 unconventional intersections: 1. CFI – Airline at Siegen, Baton Rouge, Louisiana, opened March 2006 2. CFI – Bangerter at 3500 South, Salt Lake City Utah, construction starts early 2007 3. DDI – Kansas City, Missouri
29
Where is CFI Today? Louisiana – 1 Open, 8 studied or currently under study 1. Airline Highway at Siegen Lane (Open) 2. Airline Highway at Goodwood, Old Hammond, Bluebonnet, Jefferson 3. Florida Boulevard at Sherwood Forest Boulevard 4. Alexandria Traffic Circle 5. Ambassador Caffrey Parkway at Johnston Street 6. Statewide Study on-going, All Districts (90+ Intersections) Maryland – 1 operational, 6 studied or currently under study MD 228 at MD 210 (operational) 1. MD 140 Corridor Study – 7 intersections / 3 CFI’s 2. US 29 at Stewart Lane / Eden Lane 3. MD 140 at Painters Mill Road 4. MD 213 at US 40
30
Mississippi – 1 Under Construction, 1 Under Design 1. US 61 at Junkin Drive (Under construction, 2010 Opening) 2. US 49 at State Route 53 (Final Plan Stage) 3. US 61 at Devereaux Road 4. Jackson at State Route 6 Ohio – 1 Under Construction, 1 Under Design, 5 studied or currently under study 1. Austin Pike at State Route 741 (Under Construction) 2. Beachmont at 5-Mile (Preliminary Design) 3. Columbus Pike at Powell Road 4. Brice Road at Scarborough / Tussing Boulevard 5. State Route 32 at Glenestre 6. State Route 32 at Bells Lane 7. State Route 32 at Baur Road Utah – 1 Open to Traffic Bangater Hwy at 3500 South Arkansas - 1 studied Shackleford Highway at I-630 / Financial Center Parkway Statewide Study on-going
32
Questions www.abmb.com Laurence Lambert, P.E., PTOE llambert@abmb.com
33
Opening
34
Accident Data Four-Leg Signalized CFI March 21-September 21 March 22-September 21March 21-September 21 Type of Collision200220032004200620072008 Fatalitie s Seriou s Injurie s PDOTotalFatalitie s Seriou s Injurie s PDOTotalFatalitie s Seriou s Injurie s PDOTotalFatalitie s Seriou s Injurie s PDOTotalFatalitie s Seriou s Injurie s PDOTotalFatalitie s Seriou s Injurie s PDOTota l Rear End0618240571203 150212140268011617 Merging/Diverging/Si de Swiping 016700220044004401560055 Crossing(Left Turn)012302240134001101120000 Crossing (angle)000000000000001100000000 Right Angle03912086140358013405050101 Right Turn001100000000000001010011 Head On000000000000000000000101 Total01136470151732072431032124010122202 24 Four-Leg Signalized CFI June 1-August 31 Type of Collision200220032004200620072008 Fatalitie s Seriou s Injurie s PDOTotalFatalitie s Seriou s Injurie s PDOTotalFatalitie s Seriou s Injurie s PDOTotalFatalitie s Seriou s Injurie s PDOTotalFatalitie s Seriou s Injurie s PDOTotalFatalitie s Seriou s Injurie s PDOTota l Rear End04913033602810009901450189 Merging/Diverging/Si de Swiping 004400110011002200110022 Crossing(Left Turn)012302240112000000000000 Crossing (angle)000000000000000000000000 Right Angle0055055100123011204040000 Right Turn001100000000000000000011 Head On000000000000000000000101 Total052126010112104121601121305510011112
35
Operations
Similar presentations