AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA
2
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION PITTSBURGH STATE COLLEGE PHILADELPHIA
3
SOUTHWEST PENNSYLVANIA URBAN ENVIRONMENT ADJACENT PARKING GARAGE PITTSBURGH STATE COLLEGE PHILADELPHIA INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION
4
PITTSBURGH STATE COLLEGE PHILADELPHIA PROPERTY DEVELOPER INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION SOUTHWEST PENNSYLVANIA URBAN ENVIRONMENT ADJACENT PARKING GARAGE
5
PITTSBURGH STATE COLLEGE PHILADELPHIA PROPERTY DEVELOPER ARCHITEC T INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION SOUTHWEST PENNSYLVANIA URBAN ENVIRONMENT ADJACENT PARKING GARAGE
6
PITTSBURGH STATE COLLEGE PHILADELPHIA PROPERTY DEVELOPER ARCHITEC T STRUCTURAL ENGINEER INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION SOUTHWEST PENNSYLVANIA URBAN ENVIRONMENT ADJACENT PARKING GARAGE
7
PITTSBURGH STATE COLLEGE PHILADELPHIA PROPERTY DEVELOPER ARCHITEC T STRUCTURAL ENGINEER CIVIL ENGINEER INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION SOUTHWEST PENNSYLVANIA URBAN ENVIRONMENT ADJACENT PARKING GARAGE
8
PITTSBURGH STATE COLLEGE PHILADELPHIA PROPERTY DEVELOPER ARCHITEC T STRUCTURAL ENGINEER CIVIL ENGINEER MEP ENGINEER INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION SOUTHWEST PENNSYLVANIA URBAN ENVIRONMENT ADJACENT PARKING GARAGE
9
OCCUPANCY – OFFICE LEVELS - 6 SIZE – 144,000 S.F. COST - $18.5 MILLION COMPLETED – DECEMBER 2006 INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION
10
LIMESTONE BASE OCCUPANCY – OFFICE LEVELS - 6 SIZE – 144,000 S.F. COST - $18.5 MILLION COMPLETED – DECEMBER 2006 INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION
11
LIMESTONE BASE OCCUPANCY – OFFICE LEVELS - 6 SIZE – 144,000 S.F. COST - $18.5 MILLION COMPLETED – DECEMBER 2006 GLAZING & CURTAIN WALL INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION
12
LIMESTONE BASE OCCUPANCY – OFFICE LEVELS - 6 SIZE – 144,000 S.F. COST - $18.5 MILLION COMPLETED – DECEMBER 2006 BRICK VENEER GLAZING & CURTAIN WALL INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION
13
LIMESTONE BASE OCCUPANCY – OFFICE LEVELS - 6 SIZE – 144,000 S.F. COST - $18.5 MILLION COMPLETED – DECEMBER 2006 BRICK VENEER GLAZING & CURTAIN WALL METAL PANELING INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION
14
TYPICAL BAYS CONSIDERED - 35’ x 42’ 28’ x 35’ - N INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION
15
TYPICAL BAYS CONSIDERED - 35’ x 42’ 28’ x 35’ - N INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION
16
TYPICAL BAYS CONSIDERED - 35’ x 42’ 28’ x 35’ - DECKING REGIONS - N-S E- W- NN INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION
17
EXISTING ECCENTRIC FRAMES - FULL HEIGHT FRAMES - GROUND LEVEL FRAMES N INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION
18
EXISTING ECCENTRIC FRAMES - FULL HEIGHT FRAMES - GROUND LEVEL FRAMES N
19
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION PROPOSA L
20
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION PROPOSA L OPEN-WEB STEEL JOIST FLOOR SYSTEM
21
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION PROPOSA L OPEN-WEB STEEL JOIST FLOOR SYSTEM HVAC INTEGRATION
22
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION PROPOSA L OPEN-WEB STEEL JOIST FLOOR SYSTEM HVAC INTEGRATION CONCENTRIC LATERAL FRAMING
23
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION PROPOSA L OPEN-WEB STEEL JOIST FLOOR SYSTEM HVAC INTEGRATION CONCENTRIC LATERAL FRAMING ARCHITECTURAL IMPACT
24
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION OPEN-WEB STEEL JOIST FLOOR SYSTEM NON-COMPOSITE SYSTEM 2” DECK WITH 4.5” SLAB 28” DEPTH RESTRICTION 42’ SPAN 80psf DEAD LOAD 100psf LIVE LOAD N
25
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION OPEN-WEB STEEL JOIST FLOOR SYSTEM NON-COMPOSITE SYSTEM 2” DECK WITH 4.5” SLAB 28” DEPTH RESTRICTION 42’ SPAN 80psf DEAD LOAD 100psf LIVE LOAD N
26
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION VIBRATION CONCERNS 2” DECK WITH 4.5” SLAB 28LH11JOISTS w/ 42’ SPAN W30x108 GIRDER w/ 35’ SPAN 80psf DEAD LOAD 100psf LIVE LOAD N
27
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION N
28
N N ECCENTRIC FRAMING CONCENTRIC FRAMING N
29
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION HVAC INTEGRATION 18” X 30” SUPPLY DUCT 8” AUXILARY DUCTS 36” - CONCRETE SLAB - ACOUSTIC TILE CEILING - HVAC DUCTS - FLOOR STRUCTURE
30
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION HVAC INTEGRATION 18” X 30” SUPPLY DUCT 8” AUXILARY DUCTS 36” 31” - CONCRETE SLAB - ACOUSTIC TILE CEILING - HVAC DUCTS - FLOOR STRUCTURE
31
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION FRAME COMPARISON MAXIMUM WIND SPEED 90mph CONTROLLING LOAD CASE WIND N-S TOTAL BASE SHEAR 496 kips
32
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION FRAME COMPARISON MAXIMUM WIND SPEED 90mph CONTROLLING LOAD CASE WIND N-S TOTAL BASE SHEAR 496 kips N CENTER OF RIGIDITY
33
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION FRAME COMPARISON MAXIMUM WIND SPEED 90mph CONTROLLING LOAD CASE WIND N-S TOTAL BASE SHEAR 496 kips N CENTER OF RIGIDITY - LINE 1 FRAME ANALYZED
34
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION FRAME COMPARISON MAXIMUM WIND SPEED 90mph CONTROLLING LOAD CASE WIND N-S TOTAL BASE SHEAR 496 kips DRIFT AT ROOF – 3.28” N CENTER OF RIGIDITY - LINE 1 FRAME ANALYZED DISPLACEMENTS AMPLIFIED BY A FACTOR OF 50
35
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION FRAME COMPARISON MAXIMUM WIND SPEED 90mph CONTROLLING LOAD CASE WIND N-S TOTAL BASE SHEAR 496 kips DRIFT AT ROOF – 3.28” DRIFT AT ROOF – 1.52” N CENTER OF RIGIDITY - LINE 1 FRAME ANALYZED DISPLACEMENTS AMPLIFIED BY A FACTOR OF 50
36
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION ARCHITECHURAL IMPACT N ECCENTRIC BAYS - 11 ECCENTRIC FRAMING
37
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION ARCHITECHURAL IMPACT N N ECCENTRIC BAYS - 11 CONCENTRIC BAYS - 5 ECCENTRIC FRAMING CONCENTRIC FRAMING
38
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION ARCHITECHURA L IMPACT N CONCENTRIC FRAMING
39
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION ARCHITECHURA L IMPACT N
40
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION ARCHITECHURA L IMPACT N
41
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION STRUCTURA L REVIEW
42
OPEN-WEB STEEL JOIST FLOOR SYSTEM 28LH11 JOIST W30X108 GIRDER C=1/2” SATISFIES VIBRATION CONCERNS INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION
43
STRUCTURA L REVIEW OPEN-WEB STEEL JOIST FLOOR SYSTEM 28LH11 JOIST W30X108 GIRDER C=1/2” SATISFIES VIBRATION CONCERNS HVAC INTEGRATION CEILING RAISE POTENTIAL OF 5” INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION
44
STRUCTURA L REVIEW INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION
45
STRUCTURA L REVIEW CONCENTRIC FRAMING ELIMINATION OF 6 FRAMING BAYS 24 BRACING MEMBERS & 42 WELDED CONNECTIONS INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION
46
STRUCTURA L REVIEW CONCENTRIC FRAMING ELIMINATION OF 6 FRAMING BAYS 24 BRACING MEMBERS & 42 WELDED CONNECTIONS ARCHITECTURAL IMPACT CURTAIN WALLS USED IN FRAMING BAYS INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION
47
BREADTH STUDIES INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION
48
BREADTH STUDIES INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION DAYLIGHTING BUILDING MODELED TO VISUALIZE SHADOWS JANUARY & JUNE 9AM – 12PM – 4PM
49
BREADTH STUDIES INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION DAYLIGHTING BUILDING MODELED TO VISUALIZE SHADOWS JANUARY & JUNE 9AM – 12PM – 4PM GREEN ROOF MOST APPROPRIATE SYSTEM RESEARCHED LOADING IMPLICATIONS FALL PROTECTION
50
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION JANUARY – 9AM
51
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION JANUARY – 9AM JANUARY – 12PM
52
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION JANUARY – 9AM JANUARY – 12PM JANUARY – 4PM
53
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION JANUARY – 9AM JANUARY – 12PM JANUARY – 4PM
54
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION JUNE– 9AM
55
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION JUNE– 9AM JUNE – 12PM
56
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION JUNE– 9AM JUNE – 12PM JUNE – 4PM
57
INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION JUNE– 9AM JUNE – 12PM JUNE – 4PM
58
DAYLIGHTING CONCLUSION S INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION JANUARY LOW SOUTHERN LIGHT BEST MITIGATED WITH OPERABLE INTERIOR SHADES MORNING AND EVENING SUNLIGHT PARTIALLY SHADED USING VERTICAL FINS http://www.angarch.com/products/brise-soleil_01_archive.html
59
DAYLIGHTING CONCLUSION S INTRODUCTION GRAVITY LATERAL REDESIGN DAYLIGHTING CONCLUSION JUNE HIGH ANGLE AFTERNOON LIGHT BEST MITIGATED WITH HORIZONTAL CANTILEVER SHADES MORNING AND EVENING SUNLIGHT BEST MITIGATED WITH INTERIOR OPERABLE SHADES http://levolux.blogspot.com/2012_02
61
ACKNOWLEDGEMEN TS MILLCRAFT INV. A.E. DEPT. FACULTY FAMILY, FRIENDS, CLASSMATES
62
ACKNOWLEDGEMEN TS MILLCRAFT INV. A.E. DEPT. FACULTY FAMILY, FRIENDS, CLASSMATES QUESTIONS ?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.