Presentation is loading. Please wait.

Presentation is loading. Please wait.

Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section Sutton 2 Sandycove Cycle Route Interim Solution at Clontarf /

Similar presentations


Presentation on theme: "Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section Sutton 2 Sandycove Cycle Route Interim Solution at Clontarf /"— Presentation transcript:

1 Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section Sutton 2 Sandycove Cycle Route Interim Solution at Clontarf / Dollymount (Wooden Bridge to Causeway Road)

2 S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD

3 Roads Traffic Condition Sea Defences Erosion Flooding Ecology SPA SCA pNHA S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD

4

5

6

7

8

9

10

11 NEXT STEPS Planning Application / Public Display Cost Construction mid 2013

12 CONCLUSION Interim Solution Deliverable in Short Term Cycling Walking Additional flood defence Coastal erosion Trunk Water Main QUESTIONS ?


Download ppt "Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section Sutton 2 Sandycove Cycle Route Interim Solution at Clontarf /"

Similar presentations


Ads by Google