Con Kehely BA, BAI, MUBC Chartered Engineer, National Transport Authority Design Section Sutton 2 Sandycove Cycle Route Interim Solution at Clontarf / Dollymount (Wooden Bridge to Causeway Road)
2
S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD
3
Roads Traffic Condition Sea Defences Erosion Flooding Ecology SPA SCA pNHA S2S:- WOODEN BRIDGE TO CAUSEWAY ROAD
11
NEXT STEPS Planning Application / Public Display Cost Construction mid 2013
12
CONCLUSION Interim Solution Deliverable in Short Term Cycling Walking Additional flood defence Coastal erosion Trunk Water Main QUESTIONS ?