1 Project Management : Techniques and Tools (60-499) Fall 2014 / Winter 2015

2 Who are the stakeholders? Clients/Customers Upper Management Project Manager Developers/Workers

3 A project manager’s role A major role of a project manager (PM) is to ensure that the project succeeds –To a lesser degree, this is also a role for other stakeholders Therefore, the PM is responsible (if not to blame) when these problems occur A project manager must remain unbiased –Customers or upper management may ask for unrealistic features and/or schedules –It is not a project manager’s role to make such schedules work, by pushing developers harder

4 What would you look for in a PM? sufficient experience –has experienced successful projects –has experienced failed projects has excellent organizational skills has excellent communication skills is a strong leader project management certifications: –Project+: Entry-level certification, for aspiring project managers –PMP: Professional cert., for experienced project managers Project management body of knowledge (PMBOK)

5 Project Management Phases 1. Defining 2. Risk Management 3. Planning & Scheduling 4. Launching 6. Closing 5. Monitoring & Controlling

6 Defining Determine what the customer wants Identify Requirements –Goals –Deliverables –Success criteria Scope

7 Goals A goal is normally a solution to a problem When defining goals, answer the following questions: –What problem will we solve? e.g. Accounting department has 2 month turnaround for budget requests, which is too long. –In what sense will we solve the problem? e.g. Our accounting software will streamline the process of budget re-work. May be made of smaller sub-goals

8 Deliverables Deliverables are the actual artifacts created by the project team for the customer These typically include: –Binary packages –Source packages (in open source projects) –Documentation & tutorials –Version history –Utilities –Installation software

9 Success Criteria Success criteria define what must be true in order for the project to be considered a success –related to the goals –attributes that can be measured e.g. The accounting department’s time to approve a budget is reduced by at least 50%.

10 Scope The project’s scope defines its boundaries –Closely related to the Requirements –PM may work with customers to decide which requirements are necessary, and which are not –Determine whether or not a feature request (change) is appropriate later Thus, scope deals with both requirements and changes

11 Risks Risks are things that could cause the project to: –Fail –Be delayed –Require additional budget –Require additional personnel A project manager should identify: –Impact: What is the expected negative impact should it occur? –Probability: How likely is it to occur?

12 Risk Document The risk document: –Identifies and describes risks –Describes what conditions make it happen –Describes the probability of it happening –Describes the impact of it happening –Describes a plan for how to (try to) avoid it happening –Describes a plan for what to do if it happens This is only done if the probability and/or impact necessitate such a plan

13 Planning We know what we want and the associated risks Now, we figure out how to do the work required We do this by: –Performing architecture & design –Identifying activities: work breakdown structure (WBS) –Identifying dependencies between activities –Estimating activity duration –Estimating activity resource requirements –Scheduling activities (start date, duration)

14 Architecture & Design Architecture: Refers to the overall structure of the application - defines the modules –Each module has a set of common responsibilities Design: Refers to the structure of the module itself –Can involve creating classes (in OOD) and assigning responsibilities (functions or data) to them

15 Activities An activity is something a participant may undertake –This could be: Designing a module Updating documentation Optimizing the search code Installing the binaries in a web server Writing a lookup method Activities can be: –Estimated for time & resource requirements –Assigned to team member(s)

16 Schedule A schedule is a time-plan for activities The schedule must: –Include all activities –Show dependencies between activities e.g. What must occur before this activity can start? –Show estimated durations for activities –Show starting points for activities –Show combined activity duration as project duration –Show estimated resources for activities –Show combined activity resource requirements as project resource requirements

17 Work Breakdown Structure The WBS: –Defines all activities Each system function is defined as a high-level activity Each activity is broken down into smaller activities This process repeats until activities are small and manageable –Shows hierarchical relationships between activities A WBS can be represented with a tree diagram

18 Project Plan The project plan defines: –Dependencies between activities e.g. Architecture must be determined before development can begin –Schedule Including an estimate of each activity’s duration –Initial activity assignment Activities are assigned to fictitious team members

19 Launching We have a detailed work plan Now, we get the work underway We do this by: –Choosing participants –Making participants available for the project –Assigning work to participants –Organizing participants into team(s) –Providing resources to the team(s) –Establish constraints and freedoms for the team(s)

20 Monitoring & Controlling We have people working on activities Now, we must ensure we are making adequate progress We do this by: –Interviewing and observing progress reports –Implementing version control software –Providing mechanisms for requesting changes –Continually updating plans (e.g. schedules )

21 Closing We have completed all activities –The result should be that All overall goals are satisfied All success criteria are met All deliverables are ready for roll-out Now, we need to complete hand-over We do this by: –Obtaining client acceptance –Deploying deliverables e.g. media disks, printed manuals, online deployment/downloads –Performing a post-mortem analysis How did we do?

22 Post-Mortem Analysis A post-mortem involves analyzing the project upon completion –This is not to be confused with QA, which analyzes the deliverables A post-mortem is a critical step, that many project managers miss –May allow the manager to More accurately estimate activities after the experience Identify mistakes made, to avoid making them again Recognize personal achievements

23 Summary Project management’s job is to ensure that projects do not fail –We must identify what the customer wants –We must identify potential pitfalls –We must list what needs to be done –We must make detailed plans –We must prepare for changes –We must ensure that our plans are being followed –We must ensure that our plans are working If not, we must update them or take another corrective action